State Industries A B C D E F 100 Periodic Maintenance, Venting System Inspection, Burner Cleaning

Page 37

PERIODIC MAINTENANCE

Venting System Inspection

At least once a year a visual inspection should be made of the venting system. You should look for:

1.Obstructions which could cause improper venting. The combustion and ventilation air flow must not be obstructed.

2.Damage or deterioration which could cause improper venting or leakage of combustion products.

Be sure the vent piping is properly connected to prevent escape of dangerous flue gasses which could cause deadly asphyxiation.

Obstructions and deteriorated vent systems may present serious health risk or asphyxiation.

Chemical vapor corrosion of the flue and vent system may occur if air for combustion contains certain chemical vapors. Spray can propellants, cleaning solvents, refrigerator and air conditioner refrigerants, swimming pool chemicals, calcium and sodium chloride, waxes, bleach and process chemicals are typical compounds which are potentially corrosive.

If after inspection of the vent system you found sooting or deterioration, something is wrong. Call the local gas utility to correct the problem and clean or replace the flue and venting before resuming operation of the water heater.

Burner OPERATION AND Inspection

Flood damage to a water heater may not be readily visible or immediately detectable. However, over a period of time a flooded

water heater will create dangerous conditions which can cause

DEATH, SERIOUS BODILY INJURY, OR PROPERTY DAMAGE. Contact a qualified installer or service agency to replace a flooded water heater. Do not attempt to repair the unit! It must be replaced!

At least once a year a visual inspection should be made of the main burner and the hot surface igniter assembly for proper flame characteristics and ignition sequences. You should also check for sooting. Soot is not normal and will impair proper combustion. A visual inspection of the main burner and HSI igniter assembly should also be done at least once a year.

Soot build-up indicates a problem that requires correction before further use. Turn “OFF” gas to water heater and leave off until repairs are made, because failure to correct the cause of the sooting can result in a fire causing death, serious injury, or property damage.

Burner Cleaning

In the event your burner or burner air openings require cleaning, turn the on/off switch to the “OFF” position and allow the unit to cool. Call a qualified service agency to remove and clean the burner and correct the problem that required the burner to be cleaned.

Housekeeping

Vacuum around base of water heater for dust, dirt, and lint on a regular basis.

37

Image 37
Contents 197836-000 Whenever maintenance adjustment or service is requiredImportant Definitions Safe INSTALLATION, USE and ServiceGeneral Safety General Safety Introduction Table of ContentsGET to Know Your Water Heater GAS Models Replacement Parts and Deliming ProductsRough-In-Dimensions Installation ConsiderationsRecovery capacity based on 96% thermal efficiency All models Maximum Supply Pressure 14 inches W.C .48kPaDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Combustion AIR and Ventilation Insulation BlanketsAppliances in Unconfined Spaces Appliances in Confined SpacesALL AIR from Outdoors See Figures 7, 8 ALL AIR from Inside Buildings SeeChemical Vapor Corrosion Installing the NEW Water HeaterWater Piping Closed Water SystemsValve and Pipe Insulation if supplied Temperature-Pressure Relief ValveGas Piping High Altitude InstallationsFilling the Water Heater Sediment Traps VentingVent Pipe Termination Canadian Power Vent Power VentVent Hoods MAY be Extremely HOT During Operation Canadian Direct Vent Direct VentPlanning the Vent System InstallationsCondensate Vent Terminal INSTALLATION, Sidewall Installation of Vent SystemSequence of INSTALLATIONS, a Direct Vent Terminal Installation ImportantVertical Vent Terminal Installation Installation SequenceVent Terminals Supplied with Heater Must be Used Installation of Vertical Vent System Installation of Vent SYSTEM, SidewallConcentric Vent Installation KIT ComponentsInstallation Procedure 1 Roof TERMINATION, see Figure C Safety ConsiderationsFigure F Procedure 2 Side Wall TERMINATION, see Figure FFigure g MULTI-CONCENTRIC Vent TerminationsVent Pipe Preparation Step E Step BStep F Step GBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch ON/OFF SwitchPower Vent Wiring Schematic Figure Do not try to light the burner by hand ON/OFF SwitchWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandHI Limit Switch E.C.O Temperature RegulationOverview Using the Electronic ControllerAction Operating StatesDisplay Action Access to the Current Fault or Warning Fault and Warning ConditionsChanging the Display Units DisplayViewing Information About the Heater Viewing the Fault HistoryStart UP Conditions For Your InformationOperational Conditions Burner Cleaning Periodic MaintenanceVenting System Inspection Burner Operation and InspectionAnode ROD Inspection Temperature-Pressure Relief Valve OperationDraining Leakage Checkpoints ServiceProblems Troubleshooting GuidelinesPage Page Limited Warranty

A B C D E F 100 specifications

State Industries A B C D E F 100 is a groundbreaking initiative aimed at revolutionizing various sectors including manufacturing, technology, and services, by integrating advanced methodologies and innovative practices. This initiative underscores a commitment to sustainability, efficiency, and quality, setting new standards for industry performance.

One notable feature of State Industries A B C D E F 100 is its focus on automation and smart manufacturing technologies. This includes the implementation of the Internet of Things (IoT) devices that facilitate real-time data collection and analysis. By harnessing this data, industries can optimize their operations, leading to improved productivity and reduced operational costs. Machine learning algorithms play a crucial role in predictive maintenance, enabling timely interventions that minimize downtime and enhance equipment longevity.

Another key aspect of State Industries A B C D E F 100 is the emphasis on renewable energy solutions. Many facilities are transitioning towards solar, wind, and other sustainable energy sources, which not only lowers carbon footprints but also leads to considerable savings in energy costs. This shift towards clean energy reflects a broader commitment to corporate social responsibility, addressing the environmental challenges faced by today’s industries.

Moreover, the initiative promotes the use of advanced materials and smart technologies in product development. These innovations not only enhance product functionality but also improve safety and sustainability. For instance, the use of biodegradable materials in packaging aligns with global efforts to reduce plastic waste, while advancements in nanotechnology offer unique solutions to traditional manufacturing challenges.

Collaboration stands as another essential characteristic of State Industries A B C D E F 100. By fostering partnerships between different stakeholders, including academia, government agencies, and private enterprises, the initiative encourages knowledge sharing and co-creation of solutions. This collaborative approach leads to the development of best practices that can be shared across sectors, amplifying the impact of technological advancements.

In conclusion, State Industries A B C D E F 100 embodies the future of industrial evolution, integrating cutting-edge technologies, sustainable practices, and collaborative efforts to create a resilient and forward-thinking industrial landscape. As industries continue to adapt to the changing global environment, the principles established by this initiative will likely play a pivotal role in shaping a sustainable and prosperous future for all.