State Industries A B C D E F 100 Blower Prover Switch, Blocked Exhaust Switch, ON/OFF Switch

Page 28

CONTROLS AND SWITCHES

This model is provided with three pressure switches. These switches are essential to the safe and proper operation of the unit. All switches are wired in series. The controller is set up to shut the unit down whenever there is a failure of any of the switches. It is important to understand the purpose of each switch.

FIGURE 12.

BLOWER PROVER SWITCH

(SEE FIGURE 12)

The Blower Prover Switch is provided on the heater to verify that the fan is operating. It is a positive pressure switch whose electrical contacts are normally open. When the fan increases the pressure in the burner, the pressure switch will allow the electrical contacts to close. The pressure switch is connected to the burner tap by a piece of tygon tubing. This tubing must be connected in order for the switch to change the electrical contacts. The controller requires that the electrical contacts on this air flow switch be open before it will allow the blower to come on.

BLOCKED EXHAUST SWITCH

(SEE FIGURE 12)

The Blocked Exhaust Switch is set up to shut the unit off when a build-up of positive pressure in the exhaust vent pipe occurs. This switch is a positive pressure switch that requires an increase in pressure to change the electrical contacts from normally closed to

open. When this switch prevents the unit from igniting, most likely the exhaust is blocked by some means. Check to see if the condensate is allowed to flow freely from the exhaust elbow and for obstructions in the exhaust venting and exhaust vent terminal. Also verify that the vent length does not exceed the maximum allowed as shown in the Vent Section of this manual.

BLOCKED INTAKE SWITCH

(SEE FIGURE 12)

The Blocked Intake Switch is set up to shut the unit off when a build-up of negative pressure in the intake air pipe occurs. This switch is a negative pressure switch that requires an increase in negative pressure to change the electrical contacts from normally closed to open. The switch is connected to the pressure tap on the PVC pipe connected to the inlet of the blower. When this switch prevents the unit from igniting, most likely the intake is blocked. Verify that the screen on the intake air connection (conventional vent), the intake air pipe and termination (direct vent installations) are free of obstructions that may prevent air from entering the unit. Insure the screen on intake air connection has been removed on direct vent installations, see Figure 18B. Also verify the intake air pipe length does not exceed the maximum allowed as shown in the Vent Section of this manual.

ON/OFF SWITCH

The ON/OFF Switch is a single-pole, single-throw rocker switch. This switch provides 120V from the line source to the heater.

CAUTION

THE WATER HEATER IS POLARITY SENSITIVE. BEFORE APPLYING ELECTRICITY TO THIS HEATER BE CERTAIN THAT SUPPLY NEUTRAL WIRE TO GROUND CHECK INDICATES ZERO VOLTAGE.

HOT SURFACE IGNITER

The Hot Surface Igniter is a device that ignites the main burner by high temperature (>1800°F or >982°C). When 120VAC is applied to the igniter, sufficient heat is generated to ignite the main burner. Although improvements have been made to strengthen the igniter, it is still fragile and care must be taken when handling the igniter to prevent breakage.

28

Image 28
Contents Whenever maintenance adjustment or service is required 197836-000Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionReplacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsInstallation Considerations Rough-In-DimensionsRecovery capacity based on 96% thermal efficiency All models Maximum Supply Pressure 14 inches W.C .48kPaDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Insulation Blankets Combustion AIR and VentilationAppliances in Unconfined Spaces Appliances in Confined SpacesALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8Installing the NEW Water Heater Chemical Vapor CorrosionWater Piping Closed Water SystemsTemperature-Pressure Relief Valve Valve and Pipe Insulation if suppliedHigh Altitude Installations Gas PipingFilling the Water Heater Sediment Traps VentingVent Pipe Termination Canadian Power Vent Power VentVent Hoods MAY be Extremely HOT During Operation Direct Vent Canadian Direct VentPlanning the Vent System InstallationsCondensate Installation of Vent System Vent Terminal INSTALLATION, SidewallSequence of INSTALLATIONS, a Direct Vent Terminal Installation ImportantVertical Vent Terminal Installation Installation SequenceVent Terminals Supplied with Heater Must be Used Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemConcentric Vent Installation KIT ComponentsSafety Considerations Installation Procedure 1 Roof TERMINATION, see Figure CProcedure 2 Side Wall TERMINATION, see Figure F Figure F MULTI-CONCENTRIC Vent Terminations Figure gVent Pipe Preparation Step B Step EStep F Step GBlower Prover Switch Blocked Exhaust SwitchBlocked Intake Switch ON/OFF SwitchPower Vent Wiring Schematic Figure ON/OFF Switch Do not try to light the burner by handWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandTemperature Regulation HI Limit Switch E.C.OUsing the Electronic Controller OverviewAction Operating StatesDisplay Action Fault and Warning Conditions Access to the Current Fault or WarningChanging the Display Units DisplayViewing the Fault History Viewing Information About the HeaterStart UP Conditions For Your InformationOperational Conditions Periodic Maintenance Burner CleaningVenting System Inspection Burner Operation and InspectionAnode ROD Inspection Temperature-Pressure Relief Valve OperationDraining Service Leakage CheckpointsTroubleshooting Guidelines ProblemsPage Page Limited Warranty