State Industries A B C D E F 100 instruction manual Directly BELOW. Keep Clear of ALL Obstructions

Page 8

INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS

For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements provided that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and CSA certified.

SIGNAGE A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1.The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building, or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems,” the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

8

Image 8
Contents Whenever maintenance adjustment or service is required 197836-000Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionReplacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsInstallation Considerations Rough-In-DimensionsRecovery capacity based on 96% thermal efficiency All models Maximum Supply Pressure 14 inches W.C .48kPaDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Insulation Blankets Combustion AIR and VentilationAppliances in Unconfined Spaces Appliances in Confined SpacesALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8Installing the NEW Water Heater Chemical Vapor CorrosionWater Piping Closed Water SystemsTemperature-Pressure Relief Valve Valve and Pipe Insulation if suppliedHigh Altitude Installations Gas PipingVent Pipe Termination Sediment Traps VentingFilling the Water Heater Vent Hoods MAY be Extremely HOT During Operation Power VentCanadian Power Vent Direct Vent Canadian Direct VentCondensate InstallationsPlanning the Vent System Installation of Vent System Vent Terminal INSTALLATION, SidewallSequence of INSTALLATIONS, a Direct Vent Terminal Installation ImportantVent Terminals Supplied with Heater Must be Used Installation SequenceVertical Vent Terminal Installation Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemConcentric Vent Installation KIT ComponentsSafety Considerations Installation Procedure 1 Roof TERMINATION, see Figure CProcedure 2 Side Wall TERMINATION, see Figure F Figure FMULTI-CONCENTRIC Vent Terminations Figure gVent Pipe Preparation Step B Step EStep F Step GBlower Prover Switch Blocked Exhaust SwitchBlocked Intake Switch ON/OFF SwitchPower Vent Wiring Schematic Figure ON/OFF Switch Do not try to light the burner by handWhat to do if YOU Smell GAS Do not TRY to Light the Burner by HandTemperature Regulation HI Limit Switch E.C.OUsing the Electronic Controller OverviewDisplay Action Operating StatesAction Fault and Warning Conditions Access to the Current Fault or WarningChanging the Display Units DisplayViewing the Fault History Viewing Information About the HeaterOperational Conditions For Your InformationStart UP Conditions Periodic Maintenance Burner CleaningVenting System Inspection Burner Operation and InspectionDraining Temperature-Pressure Relief Valve OperationAnode ROD Inspection Service Leakage CheckpointsTroubleshooting Guidelines ProblemsPage Page Limited Warranty

A B C D E F 100 specifications

State Industries A B C D E F 100 is a groundbreaking initiative aimed at revolutionizing various sectors including manufacturing, technology, and services, by integrating advanced methodologies and innovative practices. This initiative underscores a commitment to sustainability, efficiency, and quality, setting new standards for industry performance.

One notable feature of State Industries A B C D E F 100 is its focus on automation and smart manufacturing technologies. This includes the implementation of the Internet of Things (IoT) devices that facilitate real-time data collection and analysis. By harnessing this data, industries can optimize their operations, leading to improved productivity and reduced operational costs. Machine learning algorithms play a crucial role in predictive maintenance, enabling timely interventions that minimize downtime and enhance equipment longevity.

Another key aspect of State Industries A B C D E F 100 is the emphasis on renewable energy solutions. Many facilities are transitioning towards solar, wind, and other sustainable energy sources, which not only lowers carbon footprints but also leads to considerable savings in energy costs. This shift towards clean energy reflects a broader commitment to corporate social responsibility, addressing the environmental challenges faced by today’s industries.

Moreover, the initiative promotes the use of advanced materials and smart technologies in product development. These innovations not only enhance product functionality but also improve safety and sustainability. For instance, the use of biodegradable materials in packaging aligns with global efforts to reduce plastic waste, while advancements in nanotechnology offer unique solutions to traditional manufacturing challenges.

Collaboration stands as another essential characteristic of State Industries A B C D E F 100. By fostering partnerships between different stakeholders, including academia, government agencies, and private enterprises, the initiative encourages knowledge sharing and co-creation of solutions. This collaborative approach leads to the development of best practices that can be shared across sectors, amplifying the impact of technological advancements.

In conclusion, State Industries A B C D E F 100 embodies the future of industrial evolution, integrating cutting-edge technologies, sustainable practices, and collaborative efforts to create a resilient and forward-thinking industrial landscape. As industries continue to adapt to the changing global environment, the principles established by this initiative will likely play a pivotal role in shaping a sustainable and prosperous future for all.