State Industries A B C D E F 100 instruction manual Safety Considerations

Page 23

This concentric vent termination kit may be used with 3 or 4 inch diameter pipe systems. When connecting to a 4 in. diameter pipe system a 3 x 4 inch field supplied reducer is to be installed at the intake and exhaust connection of the concentric vent termination kit.

SAFETY CONSIDERATIONS

Installing and servicing water heating equipment can be hazardous due to gas and electrical components. Installation and service of the concentric vent termination requires ability equivalent to that of a qualified installer or service agent, see page 2. All precautions in the literature, on tags, and labels attached to the unit must be observed.

Follow all safety codes. Wear safety glasses and work gloves.

Figure A.

1. Determine best location for termination kit.

NOTE: Roof termination is preferred since it is less susceptible to damage, has reduced chances to intake contaminants, and less visible vent vapors.

2.Cut 1 hole (5 in. diameter)

3.Partially assemble concentric vent termination kit.

a)Cement Y concentric fitting to larger diameter kit pipe, see Figure A.

b)Cement rain cap to smaller diameter kit pipe, see Figure A.

Figure d.

NOTE: Instead of cementing the smaller pipe to the rain cap, a field-supplied stainless steel screw may be used to secure the 2 components together when field disassembly is desired for cleaning, see Figure D.

Figure b.

*Dimension 21 1/8 in. may be lengthened to 60 in. maximum. Dimension 21 1/8 in. may also be shortened by cutting the pipes, provided in the kit, to 12 in. minimum.

**Dimension 39 will change accordingly as dimension 21 1/8 in. is lengthened or shortened.

Figure c.

INSTALLATION PROCEDURE 1 ROOF TERMINATION, see Figure C.

WARNING

When using alternate screw method, drill clearance hole in rain cap and pilot hole in vent pipe for screw size being used. Failure to drill adequate holes may cause cracking of PVC components, allowing combustion products to be recirculated. Failure to follow this warning could result in personal injury or death.

WARNING

Do not operate the heater with rain cap removed or recirculation of combustion products may occur. Water may also collect inside larger combustion-air pipe and flow to the burner enclosure. Failure to follow this warning could result in product damage or improper operation, personal injury or death.

4.Install Y concentric fitting and pipe assembly through structure’s hole and field supplied roof boot/flashing.

Figure e.

NOTE: Do not allow insulation or other materials to accumulate inside pipe assembly when installing through hole.

23

Image 23
Contents 197836-000 Whenever maintenance adjustment or service is requiredImportant Definitions Safe INSTALLATION, USE and ServiceGeneral Safety General Safety Introduction Table of ContentsGET to Know Your Water Heater GAS Models Replacement Parts and Deliming ProductsAll models Maximum Supply Pressure 14 inches W.C .48kPa Installation ConsiderationsRough-In-Dimensions Recovery capacity based on 96% thermal efficiencyDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Appliances in Confined Spaces Insulation BlanketsCombustion AIR and Ventilation Appliances in Unconfined SpacesALL AIR from Outdoors See Figures 7, 8 ALL AIR from Inside Buildings SeeClosed Water Systems Installing the NEW Water HeaterChemical Vapor Corrosion Water PipingValve and Pipe Insulation if supplied Temperature-Pressure Relief ValveGas Piping High Altitude InstallationsVent Pipe Termination Sediment Traps VentingFilling the Water Heater Vent Hoods MAY be Extremely HOT During Operation Power VentCanadian Power Vent Canadian Direct Vent Direct VentCondensate InstallationsPlanning the Vent System Direct Vent Terminal Installation Important Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Sequence of INSTALLATIONS, aVent Terminals Supplied with Heater Must be Used Installation SequenceVertical Vent Terminal Installation KIT Components Installation of Vent SYSTEM, SidewallInstallation of Vertical Vent System Concentric Vent InstallationInstallation Procedure 1 Roof TERMINATION, see Figure C Safety ConsiderationsFigure F Procedure 2 Side Wall TERMINATION, see Figure FFigure g MULTI-CONCENTRIC Vent TerminationsVent Pipe Preparation Step G Step BStep E Step FON/OFF Switch Blower Prover SwitchBlocked Exhaust Switch Blocked Intake SwitchPower Vent Wiring Schematic Figure Do not TRY to Light the Burner by Hand ON/OFF SwitchDo not try to light the burner by hand What to do if YOU Smell GASHI Limit Switch E.C.O Temperature RegulationOverview Using the Electronic ControllerDisplay Action Operating StatesAction Display Fault and Warning ConditionsAccess to the Current Fault or Warning Changing the Display UnitsViewing Information About the Heater Viewing the Fault HistoryOperational Conditions For Your InformationStart UP Conditions Burner Operation and Inspection Periodic MaintenanceBurner Cleaning Venting System InspectionDraining Temperature-Pressure Relief Valve OperationAnode ROD Inspection Leakage Checkpoints ServiceProblems Troubleshooting GuidelinesPage Page Limited Warranty

A B C D E F 100 specifications

State Industries A B C D E F 100 is a groundbreaking initiative aimed at revolutionizing various sectors including manufacturing, technology, and services, by integrating advanced methodologies and innovative practices. This initiative underscores a commitment to sustainability, efficiency, and quality, setting new standards for industry performance.

One notable feature of State Industries A B C D E F 100 is its focus on automation and smart manufacturing technologies. This includes the implementation of the Internet of Things (IoT) devices that facilitate real-time data collection and analysis. By harnessing this data, industries can optimize their operations, leading to improved productivity and reduced operational costs. Machine learning algorithms play a crucial role in predictive maintenance, enabling timely interventions that minimize downtime and enhance equipment longevity.

Another key aspect of State Industries A B C D E F 100 is the emphasis on renewable energy solutions. Many facilities are transitioning towards solar, wind, and other sustainable energy sources, which not only lowers carbon footprints but also leads to considerable savings in energy costs. This shift towards clean energy reflects a broader commitment to corporate social responsibility, addressing the environmental challenges faced by today’s industries.

Moreover, the initiative promotes the use of advanced materials and smart technologies in product development. These innovations not only enhance product functionality but also improve safety and sustainability. For instance, the use of biodegradable materials in packaging aligns with global efforts to reduce plastic waste, while advancements in nanotechnology offer unique solutions to traditional manufacturing challenges.

Collaboration stands as another essential characteristic of State Industries A B C D E F 100. By fostering partnerships between different stakeholders, including academia, government agencies, and private enterprises, the initiative encourages knowledge sharing and co-creation of solutions. This collaborative approach leads to the development of best practices that can be shared across sectors, amplifying the impact of technological advancements.

In conclusion, State Industries A B C D E F 100 embodies the future of industrial evolution, integrating cutting-edge technologies, sustainable practices, and collaborative efforts to create a resilient and forward-thinking industrial landscape. As industries continue to adapt to the changing global environment, the principles established by this initiative will likely play a pivotal role in shaping a sustainable and prosperous future for all.