Pella 80AT0102 Setting the Window, Nail one 10d finishing nail or drive a #8 x 2-1/2

Page 3

F.Apply sill flashing tape #2. Cut a piece of flashing tape 12" longer than the opening width. Apply at the bottom, overlapping tape #1 by at least 1". DO NOT allow the tape to extend past the interior face of the framing (1F).

Note: The flashing tape may not fully cover the framing members.

G.Install and level sill spacers. Place 1" wide by 3/8" thick spacers on the bottom of the opening 1/2" from each side. Add shims to ensure the spacers are level. Once level, attach spacers and shims to the opening to prevent movement.

2 SETTING THE WINDOW

1G

TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS.

Note: In some installations, the cable clamps will not be accessible for cable attachment and adjustment after the window is installed. For this type of installation proceed to Cross Bracing Mount - Non Accessible Cable Attachment. The cable and clamp will have to be measured and installed before the window is installed.

A. Insert the window from the exterior of the building. Place the seat of the window at the bottom of the opening and slide the top into position. Center the window between the sides of the opening to allow clearance for shimming.

B.Place temporary bracing under the seat of the window and raise the unit until level as shown (2B).

C.Plumb and square window. Place shims 1" from the bottom and top of the window between the window and the sides of the opening. Adjust the shims as required to plumb and square the window in the opening. Place shims at the midpoint of the window sides.

D.Nail one 10d finishing nail or drive a #8 x 2-1/2"

long screw on each end, through the seat board into the rough opening.

E.Continue placing shims/spacers between the seat board and the rough opening at not more than 16" on center. Ensure the seat board is flat.

F.Nail one 10d finishing nail or drive a #8 x 2-1/2" long screw on each end, through the head board into the rough opening.

G.Place shims between the head board and the rough opening at not more than 16" on center. Ensure the head board is straight and level.

2B

Interior

2C

Interior

2F

2D

Image 3
Contents Lea las instrucciones en español en el reverso Rough Opening Preparation Cut the water resistive barrier. Fold side flaps intoOpening and staple to inside wall Nail one 10d finishing nail or drive a #8 x 2-1/2 Setting the WindowRun the cable up through the bottom of the cable clamp Cable Clamp InstallationCross Bracing Mount NON Accessible Cable Attachment Cross Bracing Mount of Cable ClampsSquare screws part way into the mounting surface Install the cable clamps. Drive the #12 x 3-1/4Fastening the Window Header Mount of Cable ClampsInsulating Foam Application Sealing the BAY/BOW Unit to the Exterior Wall CladdingApply insulating foam sealant see Caution above Page Care and Maintenance Important Notice Interior FinishingExterior Finish INT Acabado Important NotaMant Y Cuidado AcabadoMarco del extensor el Instale .G FabricanteSellador de Sellador de reborde un Aplique .pueda como profundamentePulgadas 6 sean que tapajuntas cinta de trozos dos Corte .C StimieveLladose AplicacionCable DE Abrazaderas DE Montaje ColocacionCables DE Abrazaderas DE Cruzado Refuerzo DE Montaje Accesible no CablesDE Sujecion .CRUZADO Refuerzo DE Montaje Cable de abrazadera la de base la hacia cable el Lleve .CDel espaciadores los nivele y Instale .G Abertura la de lados los y ventana la entre ventana, la deEscuadra a y plomo a ventana la Nivele .C Temporal refuerzo un Coloque .B La deGeneral uso Interior pared la en engrápelas y abertura la a acóplelasAgua al resistente barrera la Corte .C Abertura la en encaje ventana la que Compruebe .BVisitando o Pella, productos de local Constructor su de o arquitecto su de suya