Drolet GTX-I manual Vent installation, Acceptable configurations, For horizontal termination

Page 12

Figure 4

3.3.4 Vent installation

3.3.4.1 Acceptable configurations

The stove must be connected to Simpson GS Dura Vent or Security Chimneys International (Secure Vent) 4” x 6 5/8” venting. Install the vent components according to the manufacturer's instructions. Use a maximum of two 90 degree elbows and four 45 degree elbows. Slope horizontal pipe at least 1/4" (6 mm) rise per foot of horizontal run. Allow 2" (50 mm) clearance to the vent. A vinyl siding standoff must be used when terminating horizontally to vinyl siding as well a heat guard must be installed when using a 36" snorkel. Refer to the graph for allowable vent configurations.

Note: If at any time the vent-air intake piping is dismantled, use the vent manufacturer’s instructions and the sealing instructions for reassembly.

For horizontal termination:

The maximum horizontal length using the minimum vertical length must consist of:

A minimum of 6 feet (1.82m) of vertical length directly on top of stove.

One 90 degree elbow.

A maximum of 10 feet (3m) of horizontal length.

A wall thimble.

A wall thimble cover.

A horizontal termination cap.

12

Image 12
Contents Installation and Operating Instructions GTX-IInstallation MaintenanceIntroduction OperationSpecifications Register YOU Warranty OnlineIntroduction Natural GAS NG Propane LPGAppliance Dimensions Installation CodesFeatures General safetyIntended use Operation safety OperationFor Your SAFETY, Read Before Lighting Causing property damage, personal injury or loss of lifeLighting instructions Lighting InstructionsHeat output adjustment Fan operationInstallation Installation and safety notesInstallation UnpackingGas line installation Thermostat or wall switch installationRemote control installation Thermostat or wall switch installationThermostat Wire Information Wire Size MAX. Wire Length AWGVent installation Acceptable configurationsFor horizontal termination Horizontal and Vertical Vent Chart For vertical terminationTypical vent installation Use of sealant Horizontal wall vent termination Vertical installation HOTThrough Roof Framing Vent terminal locations Installation of the logs Manifold pressure regulator adjustment Pilot adjustmentInitial firing Altitude adjustment Maintenance Maintenance safetyRecommended service Glass cleaningBurner & pilot cleaning Fan installationTrouble Shooting Symptom Possible CauseValve / Switches Replacement Parts Drolet Limited Lifetime Warranty Description