Drolet GTX-I manual Hot, Vertical installation

Page 17

HOT

Basement Installations

To achieve the minimum vertical rise a 36” snorkel must be used. Where the bottom of the terminal may be blocked by snow, ensure provision is made for adequate drainage.

3.3.4.5 Vertical installation

Always maintain a 1” clearance around the vent pipe (vertical) and 2” clearance horizontal, when passing through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.

DO NOT PACK AIR SPACES WITH INSULATION.

Refer to the vent charts for maximum allowable vertical and horizontal allowable installations.

When planning your installation determine if ceiling joists, roof rafters or other framing will obstruct the vent system. You may have to use 45° elbows to navigate around any obstacles. When passing through a flat ceiling install a Box/Wall thimble. Cut a 10” square hole and frame as shown in the diagram opposite. Ensure all pipe sections are fully twist locked.

NOTE: ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC, MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).

NOTE: CONSULT DURAVENT PARTS LIST OR SECURITY CHIMNEY PARTS LIST FOR PART NUMBERS (USE ONLY DURAVENT GS SYSTEM OR SECURITY DV PARTS).

17

Image 17
Contents GTX-I Installation and Operating InstructionsMaintenance InstallationIntroduction OperationRegister YOU Warranty Online SpecificationsIntroduction Natural GAS NG Propane LPGInstallation Codes Appliance DimensionsIntended use FeaturesGeneral safety Operation Operation safetyCausing property damage, personal injury or loss of life For Your SAFETY, Read Before LightingLighting instructions Lighting InstructionsFan operation Heat output adjustmentInstallation and safety notes InstallationInstallation UnpackingThermostat or wall switch installation Gas line installationRemote control installation Thermostat or wall switch installationAWG Thermostat Wire Information Wire Size MAX. Wire LengthFor horizontal termination Vent installationAcceptable configurations For vertical termination Horizontal and Vertical Vent ChartTypical vent installation Use of sealant Horizontal wall vent termination HOT Vertical installationThrough Roof Framing Vent terminal locations Installation of the logs Initial firing Manifold pressure regulator adjustmentPilot adjustment Altitude adjustment Maintenance safety MaintenanceRecommended service Glass cleaningFan installation Burner & pilot cleaningSymptom Possible Cause Trouble ShootingValve / Switches Replacement Parts Description Drolet Limited Lifetime Warranty