Through Roof Framing

Maintain 10” opening relative to the pitch of the roof.

Use a suitable round or square support through the roof. Ensure adequate heat shield protection is provided.

Termination above Roof

Consult local codes for minimum vent cap height above the roof .

To prevent water seepage; install the flashing with upper portion slid under the roofing material and the lower portion over the roofing material.

Note: do not fasten down until the final adjustments to the vent have been made.

18

Image 18
Contents Installation and Operating Instructions GTX-IIntroduction InstallationMaintenance OperationIntroduction SpecificationsRegister YOU Warranty Online Natural GAS NG Propane LPGAppliance Dimensions Installation CodesFeatures General safetyIntended use Operation safety OperationLighting instructions For Your SAFETY, Read Before LightingCausing property damage, personal injury or loss of life Lighting InstructionsHeat output adjustment Fan operationInstallation InstallationInstallation and safety notes UnpackingRemote control installation Gas line installationThermostat or wall switch installation Thermostat or wall switch installationThermostat Wire Information Wire Size MAX. Wire Length AWGVent installation Acceptable configurationsFor horizontal termination Horizontal and Vertical Vent Chart For vertical terminationTypical vent installation Use of sealant Horizontal wall vent termination Vertical installation HOTThrough Roof Framing Vent terminal locations Installation of the logs Manifold pressure regulator adjustment Pilot adjustmentInitial firing Altitude adjustment Recommended service MaintenanceMaintenance safety Glass cleaningBurner & pilot cleaning Fan installationTrouble Shooting Symptom Possible CauseValve / Switches Replacement Parts Drolet Limited Lifetime Warranty Description