Enviro 1200-V Insert, Venice, 1700-V Insert owner manual Before starting this type of installation

Page 20

Installation

5.Mount the block-off plate using masonry screws in a masonry fireplace and sheet metal screws on a zero- clearance fireplace (screws need only be long enough to penetrate the first layer of metal).

6.Insulate the block-off plate using high - temperature fiberglass insulation and furnace cement.

Damper must be removed

Zero-clearance (metal) firebox

IMPORTANT:

DO NOT modify any part of the ZC fireplace

Mantel

Stainless steel chimney connector must extend 12" (305mm) past the block-off plate.

Block-off plate or damper adaptor.

Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Figure 19: Insert Install into a Zero-Clearance Fireplace.

Damper removed or fastened open

Mantel

The stainless steel

chimney connector must

extend 12" (305mm) past the block-off plate.

Block-off plate or damper adaptor.

Surround Panel

USA 16” (406 mm)

CND 18” (450 mm)

Masonry Fireplace

Figure 20: Masonry Fireplace Direct Connection Insert Install.

7.After installing the unit into place and the pipe through the block-off plate, use high - temperature fiberglass insulation and furnace cement to seal any gaps between the pipe and block- off plate (allow the cement to dry for at least 24 hours before burning).

Before starting this type of installation

refer to INSTALLATION - MASONRY FIREPLACE INSTALLATION - INSERT for additional

information. For clearances refer to

SPECIFICATIONS - CLEARANCES TO COMBUSTIBLES

- 1200-V INSERT and SPECIFICATIONS -

CLEARANCES TO COMBUSTIBLES - 1700-V INSERT.

See Figure 19 and 20 for examples of a masonry fireplace and a zero-clearance fireplace with a direct connection

20

Image 20
Contents Venice Table of Contents Safety Precautions Operating Instructions First StartFuel Selection Building/Maintaining a FireHelpful advice on the correct way to start your fire For Maximum EfficiencyWhat does dry, seasoned wood mean? Why can’t I get the fire lit?What type of wood is best to use as firewood? What is draft? What can cause a poor draft?1700-V Air Flow Path Specifications Air Control Rod 1200-V & 1700-V General InformationType of protection Modified Clearance Masonry Zero Clearance Minimum Depth 18 457 mm 225/16 566mm 2615/16 684mm Installation Insert UnitFloor Cast Before starting this type of installation refer 3D of Dimensions needed from Fireplace Before starting this type of installation When replacing bricks, use only pumas type fire bricks Total BricksTube C Tube B Tube a Installation of C-Cast Ceramic Baffle Installation Removal of Face Rating Label Do not Remove this Label / NE PAS Enlever Cette ÉtiquetteParts List Reference # DescriptionParts Diagram Warranty Exclusions and Limitations Warranty Installation Data Sheet