Enviro C-10365, EG40 DV owner manual Roof Pitch Minimum Height, Feet Meters

Page 13

Initial Installation

QUALIFIED INSTALLERS ONLY

STEP 5. Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well as above the roof line. The galvanized finish is desirable above the roof line, due to the higher corrosion resistance.

STEP 6. Once the pipe sections have been joined, and run up through the hole in the roof, slip an elbow strap over

the exposed sections, bend

 

Vertical

 

the support straps outwards,

 

 

and push the elbow strap

 

Termination

 

down to the roof level, as

Elbow Strap

Storm Collar

 

shown in Figure 15. Tighten

 

 

 

 

 

the clamp around the pipe

 

Flashing

 

section. Use a level to make

 

 

sure the pipe is truly vertical.

 

 

 

 

With roofing nails, secure the

 

Roofing nails

 

support straps to the roof.

 

 

 

 

 

 

Seal the nails holes heads

 

 

 

 

with non-hardening mastic.

 

 

 

 

Trim the excess length of the

 

 

 

 

support

straps that

extend

 

 

 

 

out beyond the edge of the

 

 

 

 

flashing.

 

 

 

 

 

 

STEP 7. Slip the flashing over the pipe

 

 

 

 

section

protruding

through

 

 

 

 

the roof. Secure the base

 

 

 

 

of the flashing to the roof

Figure 15: Vertical Vent Termination Installation.

with roofing nails. Use a

 

 

 

 

non-hardening sealant between the uphill edge

 

 

 

of the flashing and the roof. Insure the roofing

Table 3: Minimum ‘H’ for Figure 16

material overlaps the top edge of the flashing as

Roof Pitch

Minimum Height

shown in Figure 15. Verify that you have at least

 

 

 

the minimum clearance to combustibles at the

 

Feet

Meters

roof line.

 

 

 

Flat to 7/8

1

0.3

 

 

 

 

 

 

 

 

Over 7/12 to 8/12

1.5

0.46

 

 

 

 

Over 8/12 to 9/12

2

0.61

 

 

 

 

Over 9/12 to 10/12

2.5

0.76

 

 

 

 

Over 10/12 to 11/12

3.25

0.99

 

 

 

 

Over 11/12 to 12/12

4

1.22

 

 

 

 

Over 12/12 to 14/12

5

1.52

 

 

 

 

Over 14/12 to 16/12

6

1.83

 

 

 

 

Over 16/12 to 18/12

7

2.13

Figure 16: Height of Vertical Termination;

Over 18/12 to 20/12

7.5

2.29

Over 20/12 to 21/12

8

2.44

 

Reference Table 3.

 

 

 

 

 

 

13

Image 13
Contents S H E R W O O D I N D U S T R I E S L T D EG40 DVFor Your Safety Safety PrecautionsGeneral Table of Contents Vented GAS Fireplace Heater EG40 DV NG/LPG Codes And ApprovalsThis Enviro EG40 DV Fireplace EG40 Exterior Dimensions SpecificationsQualified Installers only Initial InstallationVent restrictor ring Vent Pipe Types with Part Numbers Venting Terminals Cannot be Recessed Into a Wall or SidingCommon Vertical Installation High temperature Silicone Male Edge Outer pipe. Push Installing Horizontal Vent Termination Do not interfere with the structural integrity of the walls Feet Meters Roof Pitch Minimum HeightMulti-Story Vent Pipe Installation KIT Components Cut away of spacers on Flex Pipe Installation InstructionsAssembly of Venting Kit Assembly of Venting into a Class ‘A’ Chimney Wiring of a Thermostat Turn the unit off and remove the log set 50% turn down HI-LOW Regulator To Test Valve Pressures GAS Line ConnectionPressure taps are located on the left side of the valve Log Placement Secondary InstallationLog Placement with Embers Operating Instructions Water Never USE AN Open Flame for Leak TESTING. IfWhat to do if YOU Smell GAS Cleaning the Inside of the Firebox Routine Maintenance and ServiceCleaning Plated Surfaces Opening the DoorProblem Possible Cause Solution Trouble ShootingParts List Parts List Parts Diagram Chassis Parts Diagram Gas Tray & Door To the Distributor WarrantyInstallation Data Sheet