Installation Instructions
VENTING INSTRUCTIONS (cont.)
FLUE INSTALLATION – CONCENTRIC VENTING
To adjust the condensate collector position:
1Loosen the 4 screws at the rear bracket.
2Slide the bracket away from the female vent top.
3Remove the 4 screws attaching the female vent top to the water heater.
4Lift up the female vent top and reposition as desired (or replace with a male vent top).
5Install the 4 screws at the vent top and tighten the 4 screws at the bracket.
Bracket
Secure the first vent component to the water heater with one
VENTING INSTRUCTIONS (cont.)
VENT PRODUCTS
Listed and Tested Vent Products for GN75DNSRSA, GN94DNSRSA and GP94DNSRSA (concentric venting)
MANUFACTURER | PRODUCT | PARTS | |
Ubbink | RoluxVent System | Refer to the manufacturer’s technical literature | |
|
| for specific part numbers and instructions. | |
At the time of printing, these manufacturers’ | |||
Corr/Guard Vent/ | |||
products were listed and tested vent products. | |||
| Air Intake System | ||
| The installer must verifyprior to installation if | ||
|
| ||
|
| proper venting is used. For | |
|
| vent materials, see http://directories.csa.international.org/ | |
|
| for the CSA Certificationrecord with approved vent materials. | |
|
|
|
VENT MANUFACTURERCONTACTINFORMATIONFOR INSTALLATIONINSTRUCTIONSAND PARTSLIST
Ubbink | |||
Telephone: 888.HOTWTER | Telephone: 1.800.772.0739 | Telephone: 1.800.835.2830 | |
(888.468.9837) |
| ||
Web Site: www.heatfab.com | 1.316.943.2351 | ||
| |||
|
| Web Site: |
20