GE GN75DNSRSA, GP94DNSRSA warranty Flue Installation Condensate Drain, Horizontal Termination with

Page 8

Installation Instructions

FLUE INSTALLATION – CONDENSATE DRAIN

HORIZONTAL TERMINATION WITH

VERTICAL TERMINATION (condensate collector

A CONDENSATE DRAIN

required in all installations)

 

3 in (75 mm)

 

minimum

8

Image 8
Contents Before Beginninginstallation Safety PrecautionsFor Your Safety Models GN75DNSRSA, GN94DNSRSA, GP94DNSRSAInstallation Instructions Safety PrecautionsParts Provided Tools YOU will NeedDescription DimensionsGN75/GN94/GP94DNSRSA Planning for Venting INTAKE/EXHAUST GuidelinesFlue Terminal Clearances Flue Terminal Clearances Ansi Z21.10.3 CSAAdditional Clearances Vent Terminal Condensate Drain Flue Installation Condensate DrainHorizontal Termination with Planning for Plumbing Shown with optional pipe coverMounting the Water Heater Clearances for Water HeaterCorrosive Atmospheres Mounting the Water Heater Mounting the WaterheaterGAS Piping GAS PipingConnecting the Water Heater to the GAS Supply Water Piping Water PipingPressure Relief Valve Internal BUILT-IN Freezer ProtectionConnecting the Water Heater to the Water Supply Supplemental Freeze ProtectionRecommended Piping for Basic Installation KEYFreeze Protection For External Piping Electrical Connection Information Electrical RequirementsVenting Instructions Venting InstructionsCondensate Maximum Vent LengthProduct Parts Flue Installation Concentric VentingVent Products High Altitude Installations GuidelinesRemote Controller Installation ConfigurationsLocation Mounting the ControllerInstallation Checklist Cleaning the Inlet FilterCleaning the Inlet Filter Outlet Flow Data Technical DataPressure Drop Curve Ladder Diagram Page