Installation Instructions
FLUE INSTALLATION – CONDENSATE DRAIN | |
HORIZONTAL TERMINATION WITH | VERTICAL TERMINATION (condensate collector |
A CONDENSATE DRAIN | required in all installations) |
| 3 in (75 mm) |
| minimum |
8
FLUE INSTALLATION – CONDENSATE DRAIN | |
HORIZONTAL TERMINATION WITH | VERTICAL TERMINATION (condensate collector |
A CONDENSATE DRAIN | required in all installations) |
| 3 in (75 mm) |
| minimum |
8