GE GP94DNSRSA, GN94DNSRSA, GN75DNSRSA warranty Flue Terminal Clearances Ansi Z21.10.3 CSA

Page 6

Installation Instructions

FLUE TERMINAL CLEARANCES

 

 

U.S. INSTALLATIONS

 

 

CLEARANCES PER

REF

DESCRIPTION

ANSI Z21.10.3

A

Clearance above grade, veranda, porch, deck or snowline

36 inches (91 cm)

B

Clearance to window or door that may be opened

12 inches (30 cm)

C

Clearance to permanently closed window

*

D

Vertical clearance to ventilated soffit, located above the terminal within

*

 

a horizontal distance of 2 feet (61 cm) from the center line of the terminal

 

E

Clearance to unventilated soffit

*

F

Clearance to outside corner

*

G

Clearance to inside corner

*

H

Clearance to each side of center line extended above meter/regulator

*

 

assembly

 

I

Clearance to service regulator vent outlet

*

J

Clearance to nonmechanical air supply inlet to building or

12 inches (30 cm)

 

the combustion air inlet to any other appliance

 

K

Clearance to a mechanical air supply inlet

3 feet (91 cm) above

 

 

if within 10 feet

 

 

(3 m) horizontally

L

Clearance above paved sidewalk or paved driveway located on public property1

*

M

Clearance under veranda, porch, deck or balcony2

*

*For clearancesnot specifiedin ANSI Z223.1/NFPA54, clearancesare in accordancewith localinstallationcodesand the requirementsof the gas supplier. Clearanceto oppositewallis 24 inches(60 cm).

1 A ventshallnot terminatedirectlyabovea sidewalkor paveddrivewaythat is locatedbetweentwo singlefamilydwellingsand servesboth dwellings.

2 Permittedonly if veranda,porch,deck or balconyis fullyopen on a minimumof two sidesbeneaththe floor.

FLUE TERMINAL CLEARANCES (ANSI Z21.10.3 • CSA 4.3)

6

Image 6
Contents For Your Safety Before BeginninginstallationSafety Precautions Models GN75DNSRSA, GN94DNSRSA, GP94DNSRSAInstallation Instructions Safety PrecautionsParts Provided Tools YOU will NeedDimensions GN75/GN94/GP94DNSRSADescription Planning for Venting INTAKE/EXHAUST GuidelinesFlue Terminal Clearances Flue Terminal Clearances Ansi Z21.10.3 CSAAdditional Clearances Vent Terminal Flue Installation Condensate Drain Horizontal Termination withCondensate Drain Planning for Plumbing Shown with optional pipe coverClearances for Water Heater Corrosive AtmospheresMounting the Water Heater Mounting the Water Heater Mounting the WaterheaterGAS Piping GAS PipingConnecting the Water Heater to the GAS Supply Pressure Relief Valve Water PipingWater Piping Internal BUILT-IN Freezer ProtectionConnecting the Water Heater to the Water Supply Supplemental Freeze ProtectionRecommended Piping for Basic Installation KEYFreeze Protection For External Piping Electrical Connection Information Electrical RequirementsCondensate Venting InstructionsVenting Instructions Maximum Vent LengthFlue Installation Concentric Venting Vent ProductsProduct Parts High Altitude Installations GuidelinesLocation Remote Controller InstallationConfigurations Mounting the ControllerCleaning the Inlet Filter Cleaning the Inlet FilterInstallation Checklist Technical Data Pressure Drop CurveOutlet Flow Data Ladder Diagram Page