GE GN75DNSRSA, GP94DNSRSA, GN94DNSRSA warranty

Page 26

Notes

26

Image 26
Contents For Your Safety Before BeginninginstallationSafety Precautions Models GN75DNSRSA, GN94DNSRSA, GP94DNSRSAInstallation Instructions Safety PrecautionsParts Provided Tools YOU will NeedDescription DimensionsGN75/GN94/GP94DNSRSA Planning for Venting INTAKE/EXHAUST GuidelinesFlue Terminal Clearances Flue Terminal Clearances Ansi Z21.10.3 CSAAdditional Clearances Vent Terminal Condensate Drain Flue Installation Condensate DrainHorizontal Termination with Planning for Plumbing Shown with optional pipe coverMounting the Water Heater Clearances for Water HeaterCorrosive Atmospheres Mounting the Water Heater Mounting the WaterheaterGAS Piping GAS PipingConnecting the Water Heater to the GAS Supply Pressure Relief Valve Water PipingWater Piping Internal BUILT-IN Freezer ProtectionConnecting the Water Heater to the Water Supply Supplemental Freeze ProtectionRecommended Piping for Basic Installation KEYFreeze Protection For External Piping Electrical Connection Information Electrical RequirementsCondensate Venting InstructionsVenting Instructions Maximum Vent LengthProduct Parts Flue Installation Concentric VentingVent Products High Altitude Installations GuidelinesLocation Remote Controller InstallationConfigurations Mounting the ControllerInstallation Checklist Cleaning the Inlet FilterCleaning the Inlet Filter Outlet Flow Data Technical DataPressure Drop Curve Ladder Diagram Page