Bradford-White Corp MI30T*F Honeywell Gas Control Testing, Disassembly, and Replacement

Page 20

TheBradfordWhite

DEFENDER

Safety System®

SERVICE PROCEDURE RG-VI

Gas Control

Testing, Disassembly & Replacement (Honeywell)

Honeywell Gas Control Testing, Disassembly, and Replacement

The Gas Control is made up of (5) major components; the control cover, the piezo igniter, the valve body, the temperature sensor, and the back plate. The Gas Control is designed so that any of these components may be replaced without replacing the entire Gas Control.

Gas Control

Valve Body

Backplate

Cover

 

 

Gas Control

Cover Screw

Piezo Igniter

 

Temperature

 

Sensor

 

Valve Body

Insertion Stick

 

Screw

 

 

LINE PRESSURE

The Gas Control is designed for a maximum line pressure of 14.0" w.c. and a minimum line pressure of 1.0" w.c. over the water heater’s rated manifold pressure (check rating plate). Line pressure must be checked with the main burner on and off to assure proper readings.

20

20

Image 20
Contents Service Manual Bradford White Introduction White Rodgers/Robertshaw Gas Valve Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Defender Installation of Inner Door With Gasket Combustion chamber Closed Circuit Thermocouple Testing White Rodgers Control Closed Circuit Thermocouple Testing Robertshaw ControlThermocouple Replacement White Rodgers/Robertshaw Gas Valve Open Circuit Thermopile Testing Honeywell Gas Control PILOT/ELECTRODE Assembly Inspection Cleaning and Replacement Piezo IGNITER, Electrode Testing and Replacement DefenderGas Valve Testing and Replacement White Rodgers/Robertshaw Line PressureMagnet Assembly Testing Robertshaw Control Thermocouple TestingMagnet Assembly Testing White Rodgers Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Position thermocouple, pilot tube and Piezo wire Honeywell Gas Control Testing, Disassembly, and Replacement Thermopile Testing Temperature Sensor Testing DefenderDetermine Water Temperature Inside Tank Sensor Resistance at Various TemperaturesGAS Control DISASSEMBLY/REASSEMBLY Temperature sensor Wire routing clip Disconnect Use caution not to bend or damage valve body pins Pull in this direction Temperature sensor Insertion stick GAS Control Replacement Defender Combustion chamber Main Burner Inspection, Adjustment Cleaning and Replacement Cast Iron Burner AdjustmentPosition thermocouple/thermopile Pilot tube and Piezo wire Burner Cleaning Resettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsScreenLok Flame Arrestor Cleaning Feedline NutDIP Tube Inspection and Replacement Anode Inspection and Replacement Generic Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com