TheBradfordWhite
DEFENDER
Safety System®
SERVICE PROCEDURE
Gas Control
Testing, Disassembly & Replacement (Honeywell)
Honeywell Gas Control Testing, Disassembly, and Replacement
The Gas Control is made up of (5) major components; the control cover, the piezo igniter, the valve body, the temperature sensor, and the back plate. The Gas Control is designed so that any of these components may be replaced without replacing the entire Gas Control.
Gas Control | Valve Body | Backplate |
Cover |
|
|
Gas Control
Cover Screw
Piezo Igniter |
| Temperature |
| Sensor | |
| Valve Body | Insertion Stick |
| Screw | |
|
|
LINE PRESSURE
The Gas Control is designed for a maximum line pressure of 14.0" w.c. and a minimum line pressure of 1.0" w.c. over the water heater’s rated manifold pressure (check rating plate). Line pressure must be checked with the main burner on and off to assure proper readings.
20
20