Bradford-White Corp MI30T*F service manual ScreenLok Flame Arrestor Cleaning, Feedline Nut

Page 36

TheBradfordWhite

DEFENDER

Safety System®

SERVICE PROCEDURE RG-IX

ScreenLok® Flame Arrestor Cleaning

ScreenLok® Flame Arrestor Cleaning

Step 1. Rotate knob of combination thermostat gas valve to the off position.

For Honeywell Control, rotate knob counter-clockwise to the “OFF” position.

For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position.

For Robertshaw Control, rotate knob clockwise to the “OFF” position.

Step 2. Remove outer jacket door.

Step 3. Remove inner door per SERVICE PROCEDURE RG-I, step 3a through 3e.

Step 4. Disconnect main burner feed line, pilot tube and thermocouple/thermopile from combination thermostat gas valve and remove burner assembly from combustion chamber.

NOTE: Feedline nut for natural gas control uses right hand threads, LP control uses left hand thread.

Feedline

Nut

Step 5. Clean ScreenLok® Flame Arrestor using stiff brush, compressed air and/or shop vacuum to remove any scale or other debris accumulation. Using a soft brush, clear jacket openings of any dirt, dust, restrictions or other obstructions.

Step 6. Remove any debris from burner assembly per SERVICE PROCEDURE RG-V and reinstall burner assembly into combustion chamber.

Step 7. Reconnect feedline, thermocouple and pilot tube to the combination thermostat/gas valve. Step 8 Reinstall inner door per SERVICE PROCEDURE RG-I, steps 4 through 13.

Step 9. To resume operation follow the instructions located on the lighting instruction label or the lighting instruction located in the installation and operation manual.

36

36

Image 36
Contents Service Manual Bradford White Introduction White Rodgers/Robertshaw Gas Valve Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Defender Installation of Inner Door With Gasket Combustion chamber Closed Circuit Thermocouple Testing White Rodgers Control Closed Circuit Thermocouple Testing Robertshaw ControlThermocouple Replacement White Rodgers/Robertshaw Gas Valve Open Circuit Thermopile Testing Honeywell Gas Control PILOT/ELECTRODE Assembly Inspection Cleaning and Replacement Piezo IGNITER, Electrode Testing and Replacement DefenderGas Valve Testing and Replacement White Rodgers/Robertshaw Line PressureThermocouple Testing Magnet Assembly Testing White Rodgers ControlMagnet Assembly Testing Robertshaw Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Position thermocouple, pilot tube and Piezo wire Honeywell Gas Control Testing, Disassembly, and Replacement Thermopile Testing Temperature Sensor Testing DefenderDetermine Water Temperature Inside Tank Sensor Resistance at Various TemperaturesGAS Control DISASSEMBLY/REASSEMBLY Temperature sensor Wire routing clip Disconnect Use caution not to bend or damage valve body pins Pull in this direction Temperature sensor Insertion stick GAS Control Replacement Defender Combustion chamber Main Burner Inspection, Adjustment Cleaning and Replacement Cast Iron Burner AdjustmentPosition thermocouple/thermopile Pilot tube and Piezo wire Burner Cleaning Resettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsScreenLok Flame Arrestor Cleaning Feedline NutDIP Tube Inspection and Replacement Anode Inspection and Replacement Generic Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com