SERVICE PROCEDURE RG-VII

Burner Operation Inspection, Adjustment

Cleaning and Replacement

MAIN BURNER: Inspection, Adjustment,

Cleaning and Replacement (cont.)

Step 3. Fully inspect inner gasket per SERVICE PROCEDURE RG-I, step 4. Replace gasket if required following SERVICE PROCEDURE I, steps 5 & 6.

Step 4. Be certain that thermocouple, pilot tube and piezo wire are routed by inner door flange as shown and Reinstall inner door per SERVICE PROCEDURE RG-I, step 10 and 11.

Position thermocouple/thermopile,

pilot tube and Piezo wire.

Step 5. Observe burner operation through sight glass of inner door. Burner should operate as adjusted in step 2, if not, repeat procedure compensating air shutter position for proper burner operation with inner door in place.

Step 6. It may be necessary to clean main burner or main burner orifice to achieve proper burner operation. If cleaning is required proceed to burner cleaning section in this procedure.

BURNER CLEANING (Steel & Cast Iron)

Step 1. Step 2.

Step 3.

Remove inner door assembly per SERVICE PROCEDURE RG-I, steps 1 through 3c.

Disconnect main burner feed line, pilot tube and thermocouple/thermopile

from combination thermostat gas valve and remove burner assembly from combustion chamber.

NOTE: Feedline nut for natural gas control uses right hand threads,

LP control uses left hand thread.

Thoroughly inspect burner surface area and burner ports and remove any loose debris accumulation.

Step 4.

On cast iron burners, inspect for any debris build up inside burner venturi. If found, disconnect feedline from burner and remove debris build up.

Burner Surface Area

Burner Port Area

Burner Venturi

Opening

Feedline

32

32

Image 32
Contents Service Manual Bradford White Introduction White Rodgers/Robertshaw Gas Valve Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Defender Installation of Inner Door With Gasket Combustion chamber Closed Circuit Thermocouple Testing White Rodgers Control Closed Circuit Thermocouple Testing Robertshaw ControlThermocouple Replacement White Rodgers/Robertshaw Gas Valve Open Circuit Thermopile Testing Honeywell Gas Control PILOT/ELECTRODE Assembly Inspection Cleaning and Replacement Piezo IGNITER, Electrode Testing and Replacement DefenderGas Valve Testing and Replacement White Rodgers/Robertshaw Line PressureMagnet Assembly Testing Robertshaw Control Thermocouple TestingMagnet Assembly Testing White Rodgers Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Position thermocouple, pilot tube and Piezo wire Honeywell Gas Control Testing, Disassembly, and Replacement Thermopile Testing Temperature Sensor Testing DefenderDetermine Water Temperature Inside Tank Sensor Resistance at Various TemperaturesGAS Control DISASSEMBLY/REASSEMBLY Temperature sensor Wire routing clip Disconnect Use caution not to bend or damage valve body pins Pull in this direction Temperature sensor Insertion stick GAS Control Replacement Defender Combustion chamber Main Burner Inspection, Adjustment Cleaning and Replacement Cast Iron Burner AdjustmentPosition thermocouple/thermopile Pilot tube and Piezo wire Burner Cleaning Resettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsScreenLok Flame Arrestor Cleaning Feedline NutDIP Tube Inspection and Replacement Anode Inspection and Replacement Generic Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com