Bradford-White Corp MI30T*F service manual Thermopile Testing, ECO Energy Cut Off Testing

Page 21

TheBradfordWhite

DEFENDER

Safety System®

SERVICE PROCEDURE RG-VI

Gas Control

Testing, Disassembly & Replacement (Honeywell)

MANIFOLD PRESSURE TESTING (this procedure presumes a maximum line pressure of 14.0" w.c.)

Step 1. Set the Gas Control to the “OFF” position.

Step 2. Remove pressure tap plug and install 1/8" NPT pipe, coupling, & pressure tap.

Gas Control shown in the “OFF” position

Step 3. Connect manometer to pressure tap.

Step 4. Follow instructions located on the lighting instructions label and proceed to light the main burner and observe manometer reading.

Step 5. Proper operating range for natural gas is: 4.0" ±0.5" w.c. Proper operating range for LP gas is: 10.0" ±0.5" w.c.

Step 6. If pressure is within the range specified in the previous step, set Gas Control knob to the “OFF” position, remove manometer and pressure tap, and replace pressure tap plug. Check for gas leaks prior to placing water heater back into operation by following the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Step 7. If gas pressure is outside the specification noted above, refer to “Honeywell Gas Control Testing, Disassembly, and Replacement” to replace Gas Control or valve body.

THERMOPILE TESTING

See SERVICE PROCEDURE RG-II

Pressure Tap

Shown Installed

ECO (Energy Cut Off) TESTING

The Honeywell Gas Control is designed with an ECO device that will reset.

To reset the Gas Control after an error code (4), turn the Gas Control knob to the “OFF” position and wait a minimum of (5) minutes before relighting following the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

21

21

Image 21
Contents Service Manual Bradford White Introduction White Rodgers/Robertshaw Gas Valve Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Honeywell Gas Control Troubleshooting Chart Defender Installation of Inner Door With Gasket Combustion chamber Closed Circuit Thermocouple Testing Robertshaw Control Closed Circuit Thermocouple Testing White Rodgers ControlThermocouple Replacement White Rodgers/Robertshaw Gas Valve Open Circuit Thermopile Testing Honeywell Gas Control PILOT/ELECTRODE Assembly Inspection Cleaning and Replacement Defender Piezo IGNITER, Electrode Testing and ReplacementLine Pressure Gas Valve Testing and Replacement White Rodgers/RobertshawThermocouple Testing Magnet Assembly Testing White Rodgers ControlMagnet Assembly Testing Robertshaw Control Combination THERMOSTAT/GAS Valve Replacement ECO Energy Cut Off TestingWrench Boss Position thermocouple, pilot tube and Piezo wire Honeywell Gas Control Testing, Disassembly, and Replacement Thermopile Testing Defender Temperature Sensor TestingSensor Resistance at Various Temperatures Determine Water Temperature Inside TankGAS Control DISASSEMBLY/REASSEMBLY Temperature sensor Wire routing clip Disconnect Use caution not to bend or damage valve body pins Pull in this direction Temperature sensor Insertion stick GAS Control Replacement Defender Combustion chamber Cast Iron Burner Adjustment Main Burner Inspection, Adjustment Cleaning and ReplacementPosition thermocouple/thermopile Pilot tube and Piezo wire Burner Cleaning Resettable Thermal Switch Continuity Testing Over Tighten Screws Resettable Thermal Switch ReplacementFeedline Nut ScreenLok Flame Arrestor CleaningDIP Tube Inspection and Replacement Anode Inspection and Replacement Generic Parts List Parts@bradfordwhite.com Techserv@bradfordwhite.com