Environmental conditions
If the available clearance is less than 100 cm, flexible magnesium anodes may be ordered from A.O. Smith, the installer / supplier.
nRemark
When installing the appliance, be aware that any leakage from the tank and/ or connections can cause damage to the immediate environment or floors below the level of the boiler room. If this is the case, then the appliance should be installed above a wastewater drain or in a suitable metal leak tray. The leak tray must have an appropriate wastewater drain and must be at least 5cm deep with a length and width at least 5cm greater than the diameter of the appliance.
Figure 3.1 Working clearances