6.0 Rigging-Strength Ratings and Safety Factors (cont’)

6.32 Suspension-Line Angles

Refer to Table 9 and Figure 25 for specific eyebolt angle and weight limitiations when using all-eyebolt clusters. These limits are not to be exceeded under any circumstances. If a higher safety factor than 8:1 is required, the angle limitations for each eyebolt may actually decrease to a number less than what is shown in Figure 25.

Always make sure that the suspension line is in the plane of the eyebolt, as shown in Figure 17. Readjust the eyebolt during the installation if necessary to maintain this alignment.

Figure 26a:

Figure 26b:

All-eyebolt suspension-line angle limit,

All-eyebolt suspension-line angle limit,

independent suspension lines

bridled suspension lines

6.33 Left-to-Right All-Eyebolt Cluster Angles

 

The suspended all-eyebolt cluster must be perpendicular (plumb) to within ±5° as shown in Figure 27.

Figure 27:

Left-to-right angle limits for an all-eyebolt cluster (angle shown exaggerated for illustration purposes)

Electro-Voice EVF/EVH User Manual

41

Image 41 Contents
Page Table of Contents Rigging-Safety Warning Table of Contents cont’Introduction EVF-1122S/96 example Introduction cont’End View Front View Side View 143.0 lb 64.9 kg 145.5 lb 66.1 kg Dimension Key suspension point dimensions as shown in figure aboveEVH Horn-Loaded Series Finishes and Colors AvailableEVF Front-Loaded Series Tool List Accessories for EVF and EVH SystemsDirectivity Break Frequency Defined General Aiming and Placement GuidelinesDesigning an EVF/EVH Cluster Basic Clustering Guidelines Designing an EVF/EVH Cluster cont’Coverage-Uniformity Target Multiple-Source Interference in Clusters See text for more details NormalizedReducing Multiple-Source Interference EVF Full-Range Designing an EVF/EVH Cluster cont’ Passive/Biamp Crossover Configuration Preparing EVF and EVH Systems for InstallationRecommended Preflight Procedures Rotation of High-Frequency Waveguides EVF systems Preparing EVF and EVH Systems for Installation cont’Digital Signal Processing Full-Range Systems in Passive Mode Preparing EVF and EVH Systems for Installation cont’ Introduction Flying EV-Innovation EV-I Loudspeaker System EVF and EVH Rigging SystemVRK-1 or HRK-1 connection VRK-2 or HRK-2 connection VRK-1 or HRK-1 connectionVRK-1 rigging kit with parts identified EVF and EVH Rigging System cont’VRK-2 rigging kit with parts identified VRK-3 rigging kit with parts identifiedHRK-3 rigging kit with parts identified HRK-1 rigging kit with parts identifiedHRK-2 rigging kit with parts identified EV-I Rigging Primer Important Details that Apply to the VRK and HRK Rigging KitsEVF and EVH Rigging System cont’ Eyebolt Installation All-Eyebolt Clusters Hardware not shown, using aTwo-system horizontal cluster using VRK Kits and Vertically Rigged Clusters Systems, using a moderate trim angleSystems, using an extreme trim angle HRK Kits and Horizontally Rigged Clusters EVF Full-Range Six-enclosure horizontal hang of three systems above Assembly Instructions for VRK and HRK kits Short in front Toward grille Working Load Limit and Safety-Factor Definitions Rigging-Strength Ratings and Safety FactorsStructural Rating Overview Rigging-Strength Ratings and Safety Factors cont’All-Eyebolt Structural Ratings Limits for ALL-EYEBOLT Clusters onlyWLL for M10 eyebolts in the EVI-M10K eyebolt kit Working Load Limits for EyeboltsLeft-to-Right All-Eyebolt Cluster Angles Suspension-Line AnglesVRK Rigging Structural Ratings for Vertical Clusters Limits for Vertical Clusters only WLL for M10 eyebolts in the EVI-M10K eyebolt kit Left-to-Right Vertical Cluster Angles Maximum load and maximum height for horizontal clusters HRK Rigging Structural Ratings for Horizontal ClustersTwo cluster using HRK rigging kits Using Tie Plates as Main Load-Bearing SuspensionSuspension-Line Angles for HRK Kits Symmetry for Horizontal Clusters using HRK Kits Left-to-Right Horizontal Cluster Angles Inner Connection PointsRatings for Outdoor Applications with Wind Loading Electro-Voice Structural-Analysis ProceduresRigging Inspections and Precautions Rigging printed ReferencesMechanical Engineering printed Rigging Web sitesPage Page Electro-Voice