![](/images/new-backgrounds/1050849/5084923x1.webp)
12Installation
Install the hood
NOTE
At least two people will be required to mount the hood.
1.Raise the hood into its mounting position.
2.Align the rectangular opening on the back of the hood with the
3.Level the hood with (2) 3.9x9.5mm mounting screws and secure with (2) 4.8x38mm mounting screws. Use drywall anchors provided if wall studs or framing are not available. Fig. 9.
4.Mount the electrical system plate attaching it with (3) 3.9x9.5mm mounting screws. Fig. 10.
5.On ducted hoods, attach 6" round metal duct between the hood’s blower collar and duct that leads to the outside location (Fig. 11).
6.On
7.Tape all duct joints to make them secure and air tight.
8.Plug the power cord into the electric wall receptacle. Tuck excess cord behind the flue.
MOUNTING SCREWS | MOUNTING SCREWS | PLATE OF THE | |
(3.9x9.5mm) | (3.9x9.5mm) | ||
ELECTRICAL SYSTEM | |||
|
| ||
MOUNTING SCREWS |
|
| |
(4.8x38mm) |
|
| |
WALL MOUNTING |
|
| |
BRACKET |
|
| |
MOUNTING SCREWS |
|
| |
(4.8x38mm) |
|
| |
RECTANGULAR |
|
| |
OPENING |
|
| |
FIG. 9 |
| FIG.10 | |
6” ROUND |
|
| |
METAL DUCT |
| PLENUM |
BLOWER COLLAR | 5” ROUND |
METAL DUCT |
ADAPTER
FIG.11
FIG.12