Emerson XDCF user manual Liebert Xdcf

Page 1

Precision Cooling

For Business-Critical Continuity

Liebert® XDCF

UserManual–10kW / 2.8 Tons / 34,000 BTUh

Image 1
Contents Liebert Xdcf Fluorinated Greenhouse Gas Requirements-European Union Important Safety GuidelinesTable of Contents Figures Liebert Xdcf component locations Example XD-CF10-BP-0 XD CFParts Included With Liebert Xdcf ReferencesRoom Preparation General Product InformationEquipment Inspection Product/System DescriptionUnit Handling Recyclable Packaging Unpacking the Liebert Xdcf134a Mechanical ConsiderationsInstallation Installation ConsiderationsPreparing the Lower Module for Attachment Mounting Lower Liebert Xdcf ModuleLocator hole for lower unit stud Attaching Lower Liebert Xdcf ModuleLiebert XD Flex Pipe support panel attachment Attaching Liebert XD Flex Pipe Support PanelPreparing the Upper Module for Attachment Attaching Upper Liebert Xdcf ModuleAttaching Liebert XD Flex Pipe retainers Attaching Upper Liebert Xdcf ModuleEuropean Union Fluorinated Greenhouse Gas Requirements Piping Connections and Piping Access PointsConnection Methods and Points Header SystemRecommended Piping Size Connecting Liebert XD Flex Pipes to Liebert Xdcf ModulesTools Required Liebert XD prefabricated piping assembly Tools Required Return Supply Line InsulationChecklist for Proper Installation Fluorinated Greenhouse Gas Requirements MaintenanceLiebert Xdcf specifications SpecificationsSpecifications Specifications Page Ne t