Emerson XDCF user manual Checklist for Proper Installation

Page 22

Checklist for Proper Installation

6.0CHECKLIST FOR PROPER INSTALLATION

___ 1. Liebert XDCF modules are securely attached to the cabinet.

___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves, properly connected to each Liebert XDCF module.

___ 3. Flex piping connections to prefabricated header assembly are secure and according to specifications.

___ 4. Check the R-134a refrigerant charge.

___ 5. System checked for leakage.

___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules operate properly.

___ 7. Piping is insulated.

18

Image 22
Contents Liebert Xdcf Important Safety Guidelines Fluorinated Greenhouse Gas Requirements-European UnionTable of Contents Figures Liebert Xdcf component locations XD CF Example XD-CF10-BP-0Room Preparation ReferencesParts Included With Liebert Xdcf General Product InformationEquipment Inspection Product/System DescriptionUnit Handling Unpacking the Liebert Xdcf Recyclable PackagingMechanical Considerations 134aInstallation Considerations InstallationMounting Lower Liebert Xdcf Module Preparing the Lower Module for AttachmentAttaching Lower Liebert Xdcf Module Locator hole for lower unit studAttaching Liebert XD Flex Pipe Support Panel Liebert XD Flex Pipe support panel attachmentAttaching Upper Liebert Xdcf Module Preparing the Upper Module for AttachmentAttaching Upper Liebert Xdcf Module Attaching Liebert XD Flex Pipe retainersConnection Methods and Points Piping Connections and Piping Access PointsEuropean Union Fluorinated Greenhouse Gas Requirements Header SystemRecommended Piping Size Connecting Liebert XD Flex Pipes to Liebert Xdcf ModulesTools Required Liebert XD prefabricated piping assembly Tools Required Insulation Return Supply LineChecklist for Proper Installation Maintenance Fluorinated Greenhouse Gas RequirementsSpecifications Liebert Xdcf specificationsSpecifications Specifications Page Ne t