Emerson XDCF user manual Insulation, Return Supply Line

Page 21

Piping Connections and Piping Access Points

Figure 16 Profile view of the Liebert XD system

 

Service

 

Valve

Return

Supply

Line

Line

7.Place the protective dust cap and plug back onto both ends of the coupler on the Liebert XDCF and the port pipe.

Figure 17 Piping mains without Liebert XDCF and Liebert XD Flex Pipe

8.Repeat Steps 5 through 7 for the return coupler (larger coupler).

9.Carefully lay the Liebert XD Flex Pipe aside.

NOTICE

Do not fold or bend Liebert XD Flex Pipe. Kinks in the tubing can cause permanent damage to the Liebert XD Flex Pipes.

10.Carefully unbolt the Liebert XDCF from the cabinet.

11.Place the Liebert XDCF on a stable surface.

5.7Insulation

To minimize the possibility of condensation, insulate all piping between the Liebert XDCF and the Liebert XDP or Liebert XDC.

17

Image 21
Contents Liebert Xdcf Fluorinated Greenhouse Gas Requirements-European Union Important Safety GuidelinesTable of Contents Figures Liebert Xdcf component locations Example XD-CF10-BP-0 XD CFParts Included With Liebert Xdcf ReferencesRoom Preparation General Product InformationProduct/System Description Equipment InspectionUnit Handling Recyclable Packaging Unpacking the Liebert Xdcf134a Mechanical ConsiderationsInstallation Installation ConsiderationsPreparing the Lower Module for Attachment Mounting Lower Liebert Xdcf ModuleLocator hole for lower unit stud Attaching Lower Liebert Xdcf ModuleLiebert XD Flex Pipe support panel attachment Attaching Liebert XD Flex Pipe Support PanelPreparing the Upper Module for Attachment Attaching Upper Liebert Xdcf ModuleAttaching Liebert XD Flex Pipe retainers Attaching Upper Liebert Xdcf ModuleEuropean Union Fluorinated Greenhouse Gas Requirements Piping Connections and Piping Access PointsConnection Methods and Points Header SystemConnecting Liebert XD Flex Pipes to Liebert Xdcf Modules Recommended Piping SizeTools Required Liebert XD prefabricated piping assembly Tools Required Return Supply Line InsulationChecklist for Proper Installation Fluorinated Greenhouse Gas Requirements MaintenanceLiebert Xdcf specifications SpecificationsSpecifications Specifications Page Ne t