Emerson XDCF user manual Product/System Description, Equipment Inspection, Unit Handling

Page 8

General product information

2.4Product/System Description

Upper and lower modules may be mounted on the rear of the Egenera BladeFrame. Each module, when attached to a fully loaded BladeFrame EX rack, has a nominal cooling capacity of

10kW (2.8 tons; 34,000 BTUh). Performance is based on:

Entering fluid temperature—55°F (12.8°C) and

Dew point—50°F (10°C) or lower.

The complete system consists of Liebert XDCF modules, piping and Liebert XDP or Liebert XDC (see Figure 3 below.

Figure 3 Liebert XDCF hydraulic diagram

To Chiller, Condenser or Drycooler

Liebert XDC

or

Liebert XDP

Pumped

Liebert XD

Cooling Module *

Supply Lines

Refrigerant

Return

To Chiller, Condenser or Drycooler

Liebert XDC

or

Liebert XDP

Pumped

Liebert XD

Cooling Module *

Liebert XD

Cooling Module *

Lines

Refrigerant

Liebert XD

Cooling Module *

*Liebert XDCF, XDH, XDO or XDV

2.5Equipment Inspection

Upon arrival of the unit, and before unpacking it, verify that the labeled equipment matches the bill of lading. Inspect all items for either visible or concealed damage. Damage should be immediately reported to the carrier and a damage claim filed with a copy sent to Liebert Corporation or to your sales representative.

! CAUTION

Risk of sudden refrigerant discharge! Can cause loss of charge and minor injury.

Each Liebert XDCF unit is shipped with a full charge of R-134a refrigerant under pressure. Do not remove the pipe caps or plugs before the unit is attached to an Egenera BladeFrame and ready for connection to Liebert XD Piping.

Supply and return fittings on the Liebert XDCF are one-shot connections. Do not disconnect one-shot connections after they have been connected. Disconnection will release pressurized R-134a refrigerant from the Liebert XDCF.

2.5.1Unit Handling

When unpacking and handling the unit, exercise extra care to prevent damage.

If multiple Liebert XDCF units are delivered, they will be shipped on a pallet. A pallet jack will be required to move these units to the installation location. When using a pallet jack, ensure that it has the size and length needed for safe handling of the pallet.

4

Image 8
Contents Liebert Xdcf Important Safety Guidelines Fluorinated Greenhouse Gas Requirements-European UnionTable of Contents Figures Liebert Xdcf component locations XD CF Example XD-CF10-BP-0References Parts Included With Liebert XdcfRoom Preparation General Product InformationUnit Handling Product/System DescriptionEquipment Inspection Unpacking the Liebert Xdcf Recyclable PackagingMechanical Considerations 134aInstallation Considerations InstallationMounting Lower Liebert Xdcf Module Preparing the Lower Module for AttachmentAttaching Lower Liebert Xdcf Module Locator hole for lower unit studAttaching Liebert XD Flex Pipe Support Panel Liebert XD Flex Pipe support panel attachmentAttaching Upper Liebert Xdcf Module Preparing the Upper Module for AttachmentAttaching Upper Liebert Xdcf Module Attaching Liebert XD Flex Pipe retainersPiping Connections and Piping Access Points European Union Fluorinated Greenhouse Gas RequirementsConnection Methods and Points Header SystemTools Required Connecting Liebert XD Flex Pipes to Liebert Xdcf ModulesRecommended Piping Size Liebert XD prefabricated piping assembly Tools Required Insulation Return Supply LineChecklist for Proper Installation Maintenance Fluorinated Greenhouse Gas RequirementsSpecifications Liebert Xdcf specificationsSpecifications Specifications Page Ne t