KitchenAid 30, 36, 48 installation instructions Check operation

Page 7

Check operation

16. Place filters in canopy open- ings so rear edge is over flange. Press filters up into position.

17. Turn power on.

control panel

location

18. The canopy hood controls are located in a grey panel on underside of the canopy. To open the panel, press on the front edge of panel and release. The control panel will drop down.

light

blower

blower speed

switch

switch

switch

19. Check the operation of the range hood:

Move light switch to “1” position. The light should turn on.

Move blower switch to “1” position. The blower should operate.

Move the blower speed switch to the far left; blower speed should be LOW. Move blower speed to right; blower speed should gradually increase until you reach HIGH speed at far right.

Move blower and light switches to “0” position to turn blower and light off.

If range hood does not operate:

Check that the circuit breaker is not tripped or the house fuse blown.

Disconnect power supply. Check that wiring is correct.

To get the most efficient use from your new range hood, read the “Use and Care Information” section.

Keep your KitchenAid

Installation Instructions and Use and Care Guide close to range hood for easy reference.

7

Image 7
Contents Installation Instructions Use and Care Guide Parts needed Tools neededParts supplied Venting requirements Product dimensions Cabinet dimensionsFor the most efficient and quiet operation Calculating the vent system length Venting methodsElectrical requirements Installation stepsPreparation Electrical connection Check operation Use and Care Information CleaningOperation If you need service Wiring diagramAccessories MaintenanceKitchenAid will PAY for WarrantyKitchenAid will not PAY for Our consultants provide assistance with Requesting Assistance or ServiceExcept 807 area code Direct service branches807 area code in Ontario Pour consultation ultérieure Instructions d’installation etPièces fournies Pièces nécessairesCircuit de décharge de l’air Dimensions du produit Dimensions des placardsCalcul de la longueur effective du système de décharge Configurations de circuit de déchargeQuincy, Massachusetts CSA International Les étapes de l’installationAlimentation électrique PréparationCheminée Sectionvis Supérieure Vis Bride Supérieuresection supérieure de la cheminéeBride Conduit Cheminée Section inférieure’éclairage Emplacement des Organes de commandeMettre le système sous tension Contrôler le fonctionnement de la hotteNettoyage Le ventilateur est commandé par un variateur de vitesseRenseignements d’utilisation et entretien Utilisation de la hotteSi une assistance est nécessaire AccessoiresEntretien Schéma de câblageKitchenAid Paiera GarantieKitchenAid NE Paiera PAS Pour plus dassistance Demande dassistance ou de serviceSi vous avez besoin dassistance ou de service aux É.-U Si vous avez besoin de pièces de rechange30 et 18 h 00 HNE, en composant Demande d’assistance ou de serviceSi vous avez besoin dassistance ou de service au Canada Pour plus d’assistance