Whirlpool 36, 48 Operation, Complete Installation and Check, A B Ca, A E D A

Page 13
Complete Installation and Check

A

 

B

 

C

 

D

F

E

Complete Installation and Check

 

Operation

1.Install grease filters. See the “Range Hood Care” section.

2.Check operation of the range hood blower and lights. See the “Range Hood Use” section.

A B CA

A. White wires

B. Black wires

C. UL listed wire connectors

D. Green, bare or yellow/green wires

E. Home power supply

F. UL listed or CSA approved ¹⁄₂" (1.3 cm) strain relief

3.Use UL listed wire connectors and connect black wires (B) together.

4.Use UL listed wire connectors and connect white wires (A) together.

OperationWARNING

Electrical Shock Hazard

Electrically ground blower.

Connect ground wire to green and yellow ground wire in terminal box.

Failure to do so can result in death or electrical shock.

NOTE: When using an In-line blower motor system, the green (or green/yellow) ground wire in the conduit from the In-line blower motor system is to be connected with the green (or bare) wire of the home power supply cable and with the green/yellow wire (D) in the terminal box.

5.Connect green (or bare) ground wire from home power supply to the green/yellow ground wire (D) in terminal box using UL listed wire connectors.

6.Install terminal box cover.

7.Check that all light bulbs are secure in their sockets.

8.Reconnect power.

A E D A

A. Halogen lights

B. Halogen light switch

C. Blower control switches

D. Grease filter handle

E. Grease filter

3.If the range hood does not operate, check to see whether a circuit breaker has tripped or a household fuse has blown. Disconnect power supply and check that the wiring is correct.

NOTE: To get the most efficient use from your new hood liner, read the “Range Hood Use” section.

13

Image 13
Contents FOR RESIDENTIAL USE ONLY IMPORTANT READ AND SAVE THESE INSTRUCTIONSIMPORTANT LIRE ET CONSERVER CES INSTRUCTIONS POUR UTILISATION RÉSIDENTIELLE UNIQUEMENTTABLE DES MATIÈRES RANGE HOOD SAFETYDANGER TABLE OF CONTENTSREAD AND SAVE THESE INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONSFor Mobile Home Installations INSTALLATION REQUIREMENTSCabinet Dimensions Tools and PartsCold weather installations Product DimensionsVenting Requirements Makeup airCalculating Vent System Length Electrical RequirementsExample vent system C D B APrepare Location INSTALLATION INSTRUCTIONSHood Liner Support Preparation Complete PreparationInstall Range Hood Liner Install Hood Liner Internal Blower MotorPrepare the Internal Blower System B A D E CSingle Blower Motor Assembly Install Hood Liner Internal Blower MotorDual Blower Motor Assembly C B AInstall In-lineBlower System Install Hood Liner In-LineExternal TypeBlower Motor Prepare for Mounting the In-LineBlower SystemBlower Motor System Make Electrical Connections for In-LineElectrical Connection Inside In-lineBlower System Complete Preparationto Hood Liner Make Electrical Power Supply ConnectionDisconnect power before servicing Electrical Shock HazardOperation Complete Installation and CheckA B CA A E D ARANGE HOOD USE Adjusting the fanRange Hood Controls Operating the fanRANGE HOOD CARE CleaningExterior Surfaces Metal Grease FilterMotor Characteristics WIRING DIAGRAMSE112A Motor Resistance OhmsAccessories ASSISTANCE OR SERVICEIf you need replacement parts In the U.S.ALIMITED WARRANTY WHIRLPOOL CORPORATION MAJOR APPLIANCE WARRANTYITEMS EXCLUDED FROM WARRANTY This limited warranty does not coverDANGER AVERTISSEMENT SÉCURITÉ DE LA HOTTE DE CUISINIÈRELIRE ET CONSERVER CES INSTRUCTIONS IMPORTANTES INSTRUCTIONS DE SÉCURITÉExigences demplacement EXIGENCES DINSTALLATIONInstallation dans une résidence mobile Dimensions du placardInstallations pour régions à climat froid Dimensions du produitExigences concernant l’évacuation Air d’appointExemple de circuit d’évacuation Spécifications électriquesCalcul de la longueur du circuit d’évacuation Décharge à travers le toitPréparation de lemplacement INSTRUCTIONS D’INSTALLATIONAVERTISSEMENT Préparation du support de la caisse de la hotteInstallation de la caisse de la hotte Installation dumoteurdu ventilateur internede la caisse de la hotte Préparation du système de ventilation interneEnsemble à deux moteurs-ventilateurs Ensemble à un seul moteur-ventilateurC B A Préparation du système de ventilation en ligne Installation du système de ventilation en ligneAVERTISSEMENT A B C DAchever la préparation AVERTISSEMENTC D E F G H Risque de choc électrique AVERTISSEMENTRelier le ventilateur à la terre C D E F G HRéalisation des connexions de Achever linstallation et vérifier lel’alimentation électrique à la caisse de la hotte fonctionnementCommande de la lampe Commandes de la hotte de cuisinièreUTILISATION DE LA HOTTE Fonctionnement du ventilateurENTRETIEN DE LA HOTTE Remplacement d’une lampe à halogèneNettoyage Surfaces externesRésistance du moteur ohms SCHÉMA DE CÂBLAGECaractéristiques du moteur SE112AAccessoires ASSISTANCE OU SERVICEAu Canada Si vous avez besoin de pièces de rechangeWHIRLPOOL CORPORATION GARANTIE DES GROS APPAREILS MÉNAGERSGARANTIE LIMITÉE ARTICLES EXCLUS DE LA GARANTIE2011 Whirlpool Corporation W10331011B2/11 All rights reserved