CURTAINS AND DRAINBACK PANS, MODEL FT900D
Curtains and drainback pans must be in their proper places, Fig. 32 . . .
•Hang a short curtain at the unload side of every upper prewash, wash, power rinse and dual rinse arm.
•If equipped with a
•Hang a long curtain on both sides of the prewash / wash section joint and the wash / power rinse section joint.
•Hang two long curtains at the load end.
•Hang one long curtain at the unload end.
•Drainback pan locations are shown for reference only.
FT900D |
|
|
| |
R TO L OPERATION |
|
|
| |
8' CENTER SECTION |
|
|
| |
SHORT CURTAIN | FINAL RINSE ARM |
|
| |
ONLY WHEN | DUAL RINSE ARM |
|
| |
|
| |||
POWER RINSE ARM | WASH ARM | PREWASH ARM | ||
IS PRESENT | ||||
|
|
| ||
FOUR SHORT |
|
|
| |
CURTAINS |
|
|
| |
AT UNLOAD SIDE |
|
|
| |
OF UPPER ARMS |
|
| THREE PAIRS OF | |
|
|
| ||
ONE LONG CURTAIN |
|
| LONG CURTAINS | |
|
|
| ||
AT UNLOAD END |
|
|
| |
UNLOAD |
|
| LOAD | |
|
|
| ||
| TWO LONG & THREE SHORT |
| ||
DUAL RINSE | DRAINBACK PANS |
| ||
DRAINBACK PAN | STRAINERS |
|
| |
|
|
|
FT900D | FINAL RINSE ARM | |
L TO R OPERATION | FINAL RINSE ARM | |
|
| |
8' CENTER SECTION | DUAL RINSE ARM | |
PREWASH ARM | WASH ARM POWER RINSE ARM |
|
|
THREE PAIRS OF
LONG CURTAINS
TWO LONG & THREE SHORT
DRAINBACK PANS
STRAINERS
SHORT CURTAIN
ONLY WHEN
IS PRESENT
FOUR SHORT
CURTAINS
AT UNLOAD SIDE
OF UPPER ARMS
ONE LONG CURTAIN AT UNLOAD END
DUAL RINSE
DRAINBACK PAN
Fig. 32
– 12 –