Frymaster FDP65 operation manual Table of Contents

Page 4

FPD65 Series Gas Fryers

Installation & Operation Manual

TABLE OF CONTENTS

 

 

Page #

1.

INTRODUCTION

1-1

1.1

After Purchase

1-1

1.2

Ordering Parts

1-1

1.3

Service Information

1-1

1.4

Computer Information

1-1

1.5

Safety Information

1-2

1.6

Service Personnel

1-3

2.

IMPORTANT INFORMATION

2-1

2.1

Receiving and Unpacking Equipment

2-1

2.2

General

2-2

2.3

Principles of Operation

2-3

2.4

Rating Plate

2-3

2.5

Pre-Installation

2-3

2.6

Air Supply and Ventilation

2-5

2.7

Equipment Installed at High Altitudes

2-5

3.

INSTALLATION

3-1

3.1

Installing the Fryer

3-1

3.2

Gas Connections

3-4

3.3

Adjustments/Adaptation to Different Gases

3-7

3.4

Electrical Connections

3-9

4.

FRYER OPERATIONS

4-1

4.1

Initial Start-up

4-1

4.2

Boil-Out Procedure

4-3

4.3

Final Preparation

4-5

Image 4
Contents Hour Service Hotline FPD65 Series with Built-In FiltrationCanada Page Table of Contents Filtration Operation Service Information Frymaster FPD65 Series GAS Fryers IntroductionAfter Purchase Ordering PartsSafety Information Service Personnel DefinitionsFrymaster FPD65 Series GAS Fryers Important Information Receiving and Unpacking EquipmentGeneral Product DescriptionPrinciples of Operation Pre-InstallationRating Plate Installation Standards Equipment Installed at High Altitudes Air Supply and VentilationFrymaster FPD65 Series GAS Fryers Installation Installing the FryerFrymaster FPD65 Series GAS Fryers Installation Never Allow Water or Boilout Solution Into Filter System Gas Connections National Code RequirementsRecommended Gas Supply Line Sizes Gas Connections Adjustments/Adaptation To Different Gases Specifications Adjustments to Different Gas TypesGas Conversion Procedures Electrical ConnectionsFrymaster FPD65 Series GAS Fryers Fryer Operations Initial Start-upPilot Lighting Procedures, Electronic Ignition Systems Frymaster FPD65 Series GAS Fryers Fryer OperationsBoil-Out Procedure Boil-Out Procedure Final Preparation Filtration Preparation Frymaster FPD65 Series GAS Fryers Filtration OperationAssembling the Filter Frymaster FPD65 Series GAS Fryers Filtration Operation Place the crumb tray in filter pan Filter Leaf Disassembly/Assembly Cleaning the Filter Leaf Assembly Daily Filtration OperationFiltering Tools Operating the Filter Filter Operation Frymaster FPD65 Series GAS Fryers Filtration Operation Frypot Frymaster FPD65 Series GAS Fryers Filtration Operation Frymaster FPD65 Series GAS Fryers Preventative Maintenance WeeklyFrymaster FPD65 Series GAS Fryers Preventative Maintenance Periodic/ AnnualFrymaster FPD65 Series GAS Fryers Preventative Maintenance Frymaster FPD65 Series GAS Fryers Troubleshooting Pilot Burner MalfunctionMain Burner Malfunctions Main Burner Malfunctions Diagram, Main HI LimitWiring Diagram FilterFrymaster FPD65 Series GAS Fryers Parts List Cabinetry and Related ComponentsFrymaster FPD65 Series GAS Fryers Parts List FPD665 Shown Doors, Topcaps and Related ComponentsFrypots, Burners and Related Components Flue Assembly, Complete Component Box Components CM4-SFilter Pan and Related Components Oil-Drain Components 823-4189 Oil-Return Components Choose From Nipple Lengths BelowSuction Tube, Oil-Return Components Oil Suction Start Fitting This page Intentionally Left Blank Service Hotline