FRYMASTER FPD65 SERIES GAS FRYERS
CHAPTER 3: INSTALLATION
3.3.2 Gas Conversion Procedures (cont.)
Contact factory with the following information when performing conversions:
•Fryer Serial Number
•Fryer Model Number
•Gas Type
•Operating Altitude
Conversions can only be executed by qualified,
Pilot pressure adjustment | Pressure flow adjustment |
(remove cover screw to access) | (remove cover screw to access) |
Typical gas valve
Regulator Vent
Pilot gas supply connection. | ON/OFF |
3.4 Electrical Connections
The fryer when installed must be electrically grounded in accordance with local codes, or in the absence of local codes, with the National Electrical Code, ANSI/NFPA
DANGER
This fryer is equipped with
The rating plate and wiring diagram are located inside the front door. The fryer is equipped with a 120VAC
DANGER
This appliance requires electrical power for operation. Place the gas control valve in the OFF position in case of a prolonged power outage. Do not attempt to operate this appliance during a power outage.