Middleby Marshall PS536-Series Restraint Cable Installation, Model PS536ES Triple Oven Dimensions

Page 18

SECTION 2

INSTALLATION

 

1

ELECTRICAL JUNCTION BOX

 

2

 

 

2

RECOMMENDED MINIMUM CLEARANCES:

2

2

Rear of Oven to Wall - 6(150mm)

 

 

 

Non-control End of Oven to Wall - 0

 

 

Control End of Oven to Wall - 0

1

Figure 2-7. MODEL PS536ES TRIPLE OVEN DIMENSIONS

RESTRAINT CABLE INSTALLATION

Install the restraint cable assembly on the oven, as shown in Figure 2-6.

Figure 2-8. Restraint Cable Assembly Installation

14

Image 18
Contents Owners operating Page Middleby Marshall IiiTable of Contents Section Description Model IdentificationDimensions PS536ES Series Oven SpecificationsSeries PS536ES Electrical Specifications General specifications per oven cavityII. Principle of AIR Flow Heat Transfer and How It WorksII. Principle of AIR Flow Air FingersPS536ES-Series Oven Components Locations III. Component Function FigureIII. Component Function Cooling Fan Blank Plates two sizes and an Air Finger F2. Blank PlatesSection Installation UnloadingPS536ES Oven Installation Required Kits and Equipment InstallationInstallation KIT see Figure Model PS536ES Single Oven Dimensions Model PS536ES Double Oven Dimensions Restraint Cable Installation Model PS536ES Triple Oven DimensionsInstallation II. Ventilation Guidelines IV. Electric Supply for Electrically Heated Ovens 11. Typical Electric Oven Data PlateVI. Conveyor Rear Stop and END Stop Installation 13. Installing Rear and End StopsSection Operation Control FunctionsII. Component Information and Location Figures 3-1 Measuring Conveyor Speed ConveyorSee Figures 3-4 Shutdown Procedure Startup Procedures Daily StartupPower Failure III. STEP-BY-STEP OperationLocation and Description of Controls II. Normal Operation STEP-BY-STEP III. Quick Reference Digital Temperature Controller IV. Quick Reference Troubleshooting SymptomSection Maintenance Cooling Fan Maintenance DailyExterior Crumb Pans FigureII. Maintenance Monthly Section Maintenance Air Fingers Disassembly For Cleaning Standard FingersCleaning the Window Reassembly of Air FingersBack in the same way they came out Section Maintenance Reinstall End Plugs Conveyor Reassembly Into Oven Checking Conveyor Belt TensionConveyor Belt Link Removal Replacing Conveyor Belt Attaching Drive ChainLower End Plug III. Maintenance Every 3 Months Cleaning the Blower/Fan MotorElectrical Terminals VentilationSplit-belt Conveyor Shaft Cleaning Section Maintenance IV. Maintenance Every 6 Months Important NoticesKEY Spare Parts KIT Section Troubleshooting Section Troubleshooting Parts List Parts List Oven PANELS, Window and Legs QTY DescriptionParts List English Parts List Blower and Shroud Parts List Conveyor Item QTY Conveyor DescriptionParts List Split Belt Conveyor Element Machinery Compartment Section Parts List Electrical Electrical Section Schematics Electrical Schematics Section Hour Service Hotline