Bunn TITAN DUAL manual Programming the Brewer, Important Programming Notes Read Carefully, Screen

Page 13

PROGRAMMING THE BREWER

The programming of the brewer is divided into two levels. There is one function in Level 1. All other functions are accessed in Level 2.

The following function screens are in order of appearance. Each screen will have instructions on how to access and the procedures for programming the various functions of the brewer.

IMPORTANT PROGRAMMING NOTES

- READ CAREFULLY -

To exit the programming mode at any time, press and release either ON/OFF button located on the front switch panel. The display will return to the MAIN SCREEN.

If none of the five programming buttons are pressed within one minute during the setup of the brewer, the programming of the function screen that is being set will be exited and the display will return to the MAIN

SCREEN.

Always remember to place a container and funnel under the sprayhead when operating the brewer during the set-up of CALIBRATE FLOW, and testing the brew and bypass valves in SERVICE TOOLS/TEST OUTPUTS.

MAIN SCREEN

READY TO BREW

WATER TEMP: 205°

P2426

This screen will be shown when the brewer is ready for use. The screen displays the water temperature in the tank. When the water in the tank reaches the correct set temperature, the display will change from HEATING to READY TO BREW.

PROGRAMMING LOCKOUT SWITCH (located on the main circuit board.

This switch can be set to prevent access to the programming settings of the brewer. Once all the cor- rect brew settings are programmed, the operator can set the switch to the "ON" position to prohibit anyone from changing the settings. With the switch in the "ON" position, the programming menus can still be accessed to view the current settings. However, no changes will be saved.

UNLOCK

MEMORY

 

LOCK

 

PROGRAMMING

LOCKOUT SWITCH

P3048

Page 13

40119 071107

 

Image 13
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisTrademarks of Bunn-O-Matic Corporation BUNN-O-MATIC Commercial Product WarrantyIntroduction ContentsUser Notices Electrical Requirements 400/230V volt ac three phase 50/60 Hz modelsElectrical HOOK-UP Plumbing Requirements CE RequirementsPlumbing Hook UP Tank DrainOperating Controls Viewing Asset & Serial Number Initial SET-UPTank Filling until tank is filled with water Coffee Brewing Cleaning Glossary Programming Programming SwitchesProgramming Section Programming the Brewer Programming Lockout SwitchImportant Programming Notes Read Carefully ScreenProgramming Functions Level Programming the BrewerProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProgramming the Brewer Programming Functions Level 2 Procedure for setting LanguageSET Language Units Procedure for setting the UnitsSET Temp Ready Temp Procedure to set ready temperature Range 2 to 20 F 2 to 10 CProcedure to set or modify brew volumes. Range 10 to 500 oz Brew SettingsNext Press and release the right hidden button until Ton until display reads Brew Settings ?Press YES to proceed. The display should now Batches DONE? SET Pulse BREW/PREINFUSION Setting Pulse BrewOFF Time XXX Done + Drip Time Review Settings ?LEFT---- Right Are YOU Sure ?Copy Settings ? No YES Range 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingBypass OZ/M Procedure to adjust the bypass flow rate settingCalibrate Flow Procedure to calibrate the sprayhead flow rateRepeat steps 1-7 to calibrate the other side Repeat steps 1-7 to calibrate the other side Brew Counters Procedure to view/reset the brew countersProcedure to Enable/Disable Ads Enable ADSSAVE? No Edit YES Advertisement Setup Complete Procedure for enabling clean Range 0.0 to 72.0 hrs Enabl CleanTimer Enable EnergysavrDone Enable Fresh Timer Asset Number Procedure to enter the asset numberEnter Asset #? Press and release YES. The display will now readProcedure to enter the service number Service NumberEnter Service #? Service TOOLS?Procedure to test components and outputs Service ToolsTest Switches Service TOOLS? No YES Done Left HiddenPressed Quency Procedure to set factory defaults Factory DefaultsYOU SURE? Factory Default Values Troubleshooting Problem TroubleshootingProbable Cause RemedyTest switch procedures on Problem Probable Cause RemedyBrew valve Control BoardRefill probe or Sensitivity set LongTing Obstructions. Clear or replace Refill valve If the left three digit numberControl Board ON/OFF Switch Problem Probable CauseAutomatic refill will not operate or Ting Water flows into tank continuously Refill valveTo it is secure Foreign material lodged in valveHeating Time TOO Long No bypass water Bypass valve Test outputs procedures onLime buildup Sprayhead or air ventInconsistent beverage level Improper water pressure Brew volume adjustmentServer/dispenser 90 psi 138 and 620 kPaFor proper extraction Tank heaters Remove and clean lime off tank HeatersSolenoids Vibrate during operationWeak beverage Type of paper filter Water temperatureCoffee Proper extractionSchematic Wiring Diagram Schematic Wiring Diagram Titan Dual CE

TITAN DUAL specifications

The Bunn TITAN DUAL is a commercial coffee brewer designed to deliver high-quality coffee with efficiency and consistency. Made for establishments that prioritize both speed and taste, the TITAN DUAL stands out with a variety of features that enhance its usability and performance.

One of the significant features of the Bunn TITAN DUAL is its dual brewing capability, which allows users to brew two separate batches of coffee simultaneously. This is particularly beneficial for busy cafes and restaurants that need to meet high customer demand during peak hours. The brewer can support various batch sizes, empowering users to customize their brewing to match the needs of their business, whether it’s a quick single cup or several gallons at once.

The Bunn TITAN DUAL employs advanced brewing technology, including NitroCold Brew options that create a smooth, cold coffee with a unique flavor profile. This technology allows for the extraction of rich flavors while maintaining a refreshing finish, catering to modern coffee trends that demand versatility.

Another notable feature is the integrated digital brewing controls. The intuitive interface allows baristas to set precise brew times and temperatures, ensuring that each cup of coffee is consistently high quality. With programmable features, coffee shops can optimize their brewing processes, reducing waste while maximizing flavor.

The TITAN DUAL is designed for ease of maintenance, with removable parts that simplify cleaning and servicing. This ensures that the brewer can remain operational with minimal downtime, an essential aspect for any commercial kitchen environment. The stainless steel construction promises durability, making it an investment that can withstand the rigors of daily use.

Additionally, the Bunn TITAN DUAL reportedly has a high-capacity water tank, which ensures quick recovery time between brews. This feature is crucial during busy service times, as it allows for rapid preparation of coffee without long waiting periods.

With energy efficiency in mind, the brewer is designed to quickly heat water to the optimal temperature. This not only benefits the environment but also helps reduce operating costs over time.

In summary, the Bunn TITAN DUAL is an advanced commercial coffee brewer engineered for speed, efficiency, and quality. Its dual brewing capabilities, advanced technologies, and user-friendly features make it a valuable addition to any coffee-focused business, ensuring that customers receive a consistent and satisfying coffee experience.