Bunn TITAN DUAL manual Schematic Wiring Diagram

Page 57

L1

L2

L3

 

N

SCHEMATIC WIRING DIAGRAM

 

TANK LID-TOP VIEW

 

TERMINAL

 

 

 

 

 

TITAN DUAL

#1

#2

#3

 

 

 

 

 

GRN

 

HEATER

LIMIT

HEATER

BLOCK

RED

 

WHI

 

 

 

 

 

 

BLK BLK

BLU

 

• FOR 3 PHASE OPERATION, WIRE AS SHOWN.

 

LIMIT

HEATER

LIMIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• FOR SINGLE PHASE OPERATION, MOVE BLU

 

#1

#2

#3

 

 

 

 

 

WIRE INTO CELL WITH BLK WIRE; APPLY

 

 

 

 

 

 

 

 

 

POWER ACROSS L1, L2 AND N.

 

 

 

 

 

 

 

 

BLU

L3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED

L2

 

 

 

 

LIMIT #1

 

TANK HEATER #1

 

LIMIT #1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLK

 

BLK

BLK

 

 

 

 

 

BLK

 

 

 

 

BLU

BLU

 

 

 

 

L1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAIN ON/OFF

 

TERMINAL

 

 

 

 

LIMIT #2

 

TANK HEATER #2

 

LIMIT #2

 

 

 

BLOCK

 

 

 

 

 

 

 

 

SWITCH

 

 

 

RED

 

RED

 

RED

 

BLK

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLU

 

BLU

LIMIT #3

BLU

TANK HEATER #3

RED

LIMIT #3

 

 

 

 

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

J20-1

 

 

 

 

 

 

 

 

 

 

 

 

WHI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J20-3

 

 

 

 

 

 

CONTACTOR

 

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SOL

BYPASS

 

 

 

WHI

 

J21-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

J21-3

 

 

 

 

 

SOL

DISPENSE

 

 

 

 

 

WHI

O

COM

RED/BLK

 

 

 

 

 

 

 

 

 

 

 

 

N

BLK

 

 

 

 

 

 

 

LEFT

 

 

 

 

N.O.

 

 

 

 

 

 

 

 

 

 

 

T

WHI/RED

 

 

 

 

 

 

 

DISPENSE

 

 

 

WHI

R

J17-1

 

 

 

 

 

 

SOL

 

 

 

 

 

 

 

 

 

 

 

 

 

O

ORN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

 

WHI/GRN

 

 

 

 

 

 

 

 

REFILL

 

 

WHI

P

 

WHI/BLU

 

 

 

 

 

 

 

SOL

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

J17-5

 

 

 

 

 

 

 

 

 

 

 

 

B

BLU

 

 

 

SOL

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

BLU/BLK

 

 

 

 

FUNNEL LOCK

 

RIGHT

 

 

 

 

A

 

BLK

 

 

 

 

(Optional)

 

 

 

 

WHI

R

 

 

 

 

 

 

 

SOL

BYPASS

 

 

 

D

J17-10

GRY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHI

 

WHI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BRN/BLK

 

 

 

SOL

LEFT

 

 

 

 

 

 

 

J17-14

BRN/WHI

 

 

 

FUNNEL LOCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Optional)

 

 

 

 

 

 

 

J15-1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRANSFORMER

 

 

 

 

 

 

 

 

 

 

 

 

10VA

 

 

 

 

 

 

 

 

 

 

 

 

 

J15-5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J13-1

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

WHI

 

LEVEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROBE

 

 

 

 

 

 

 

 

 

 

J3-1

PNK

 

 

 

 

 

 

 

 

 

 

 

 

 

GRN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED

t

 

 

 

 

 

 

 

 

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

J3-5

PNK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROL PANEL ASSY

 

 

 

 

 

 

 

J3-8

 

 

 

1

 

 

 

 

 

 

RIGHT

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J2-1

 

 

 

 

 

 

 

 

 

 

FULL

HALF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

BREW

ON/OFF

 

 

J2-5

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

BREW

PROG

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

J2-10

 

 

 

 

 

 

 

 

 

 

PROG

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

“Control”

BREW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

J2-15

 

 

 

 

 

 

 

LEFT

 

 

PROG

PROG

 

 

 

 

 

 

 

 

 

ON/OFF

 

 

“Digital”

“Brewer”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FULL

 

 

LEFT

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

 

BREW

PROG

 

 

J2-20

 

 

 

 

 

 

 

LEFT

 

 

C

 

 

 

 

 

 

 

 

 

 

HALF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEFT

 

 

J2-22

 

 

 

 

 

 

 

 

 

 

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

BREW

 

 

 

 

 

 

 

 

 

 

RIGHT

 

 

ON/OFF

 

 

 

 

 

 

22

 

 

 

 

 

B

 

 

J16-1

 

 

 

 

 

 

ON/OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT

 

 

LEFT

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

BREW

 

 

 

 

 

 

 

 

 

 

FULL

 

 

FULL

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

J16-5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HALF

 

 

 

LEFT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HALF

 

120/208 OR 120/240

 

 

 

STATIC

 

 

 

 

 

 

 

 

 

VOLTS AC

 

 

 

SHIELD

 

 

 

 

 

 

 

 

 

50-60 Hz

 

 

 

 

 

 

 

 

 

 

 

 

3 PHASE - 1 PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 57

 

 

 

 

40119 071107

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 57
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisTrademarks of Bunn-O-Matic Corporation BUNN-O-MATIC Commercial Product WarrantyIntroduction ContentsUser Notices 400/230V volt ac three phase 50/60 Hz models Electrical RequirementsElectrical HOOK-UP Plumbing Requirements CE RequirementsPlumbing Hook UP Tank DrainOperating Controls Initial SET-UP Viewing Asset & Serial NumberTank Filling until tank is filled with water Coffee Brewing Cleaning Glossary Programming Switches ProgrammingProgramming Section Programming the Brewer Programming Lockout SwitchImportant Programming Notes Read Carefully ScreenProgramming Functions Level Programming the BrewerProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Units Procedure for setting the UnitsSET Temp Ready Temp Procedure to set ready temperature Range 2 to 20 F 2 to 10 CBrew Settings Procedure to set or modify brew volumes. Range 10 to 500 ozNext Ton until display reads Brew Settings ? Press and release the right hidden button untilPress YES to proceed. The display should now Batches DONE? SET Pulse BREW/PREINFUSION Setting Pulse BrewOFF Time XXX Done + Drip Time Review Settings ?LEFT---- Right Are YOU Sure ?Copy Settings ? No YES Range 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingBypass OZ/M Procedure to adjust the bypass flow rate settingProcedure to calibrate the sprayhead flow rate Calibrate FlowRepeat steps 1-7 to calibrate the other side Repeat steps 1-7 to calibrate the other side Brew Counters Procedure to view/reset the brew countersProcedure to Enable/Disable Ads Enable ADSSAVE? No Edit YES Advertisement Setup Complete Procedure for enabling clean Range 0.0 to 72.0 hrs Enabl CleanEnable Energysavr TimerDone Enable Fresh Timer Asset Number Procedure to enter the asset numberEnter Asset #? Press and release YES. The display will now readProcedure to enter the service number Service NumberEnter Service #? Service TOOLS?Service Tools Procedure to test components and outputsTest Switches Service TOOLS? No YES Left Hidden DonePressed Quency Factory Defaults Procedure to set factory defaultsYOU SURE? Factory Default Values Troubleshooting Problem TroubleshootingProbable Cause RemedyTest switch procedures on Problem Probable Cause RemedyBrew valve Control BoardRefill probe or Sensitivity set LongTing Obstructions. Clear or replace Refill valve If the left three digit numberProblem Probable Cause Control Board ON/OFF SwitchAutomatic refill will not operate or Ting Water flows into tank continuously Refill valveTo it is secure Foreign material lodged in valveHeating Time TOO Long No bypass water Bypass valve Test outputs procedures onLime buildup Sprayhead or air ventInconsistent beverage level Improper water pressure Brew volume adjustmentServer/dispenser 90 psi 138 and 620 kPaFor proper extraction Tank heaters Remove and clean lime off tank HeatersSolenoids Vibrate during operationWeak beverage Type of paper filter Water temperatureCoffee Proper extractionSchematic Wiring Diagram Schematic Wiring Diagram Titan Dual CE

TITAN DUAL specifications

The Bunn TITAN DUAL is a commercial coffee brewer designed to deliver high-quality coffee with efficiency and consistency. Made for establishments that prioritize both speed and taste, the TITAN DUAL stands out with a variety of features that enhance its usability and performance.

One of the significant features of the Bunn TITAN DUAL is its dual brewing capability, which allows users to brew two separate batches of coffee simultaneously. This is particularly beneficial for busy cafes and restaurants that need to meet high customer demand during peak hours. The brewer can support various batch sizes, empowering users to customize their brewing to match the needs of their business, whether it’s a quick single cup or several gallons at once.

The Bunn TITAN DUAL employs advanced brewing technology, including NitroCold Brew options that create a smooth, cold coffee with a unique flavor profile. This technology allows for the extraction of rich flavors while maintaining a refreshing finish, catering to modern coffee trends that demand versatility.

Another notable feature is the integrated digital brewing controls. The intuitive interface allows baristas to set precise brew times and temperatures, ensuring that each cup of coffee is consistently high quality. With programmable features, coffee shops can optimize their brewing processes, reducing waste while maximizing flavor.

The TITAN DUAL is designed for ease of maintenance, with removable parts that simplify cleaning and servicing. This ensures that the brewer can remain operational with minimal downtime, an essential aspect for any commercial kitchen environment. The stainless steel construction promises durability, making it an investment that can withstand the rigors of daily use.

Additionally, the Bunn TITAN DUAL reportedly has a high-capacity water tank, which ensures quick recovery time between brews. This feature is crucial during busy service times, as it allows for rapid preparation of coffee without long waiting periods.

With energy efficiency in mind, the brewer is designed to quickly heat water to the optimal temperature. This not only benefits the environment but also helps reduce operating costs over time.

In summary, the Bunn TITAN DUAL is an advanced commercial coffee brewer engineered for speed, efficiency, and quality. Its dual brewing capabilities, advanced technologies, and user-friendly features make it a valuable addition to any coffee-focused business, ensuring that customers receive a consistent and satisfying coffee experience.