Bunn TITAN DUAL manual Enable ADS, Procedure to Enable/Disable Ads

Page 33

PROGRAMMING THE BREWER (cont.)

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)

ENABLE ADS

This function allows the operator to choose whether or not to display an advertising message. An ad can be saved to the brewer by either writing the ad using the programming commands, or by entering the ad into the brewer using an AD CARD. This message will be displayed when the brewer is not in use.

Procedure to Enable/Disable Ads:

1.Press and hold the right hidden button until the display reads SET LANGUAGE. Press the right hid- den button until the display reads ENABLE ADS. The YES or NO will be flashing to indicate the current selection.

2.Press and release the NO button to disable this function, or:

3.Press and release the YES button to enable this function.

4.When finished, press and release DONE to save the new setting and advance to the next function screen.

5.If NO was selected, the display should now read ENABLE CLEAN. To exit programming and return to the MAIN SCREEN, press and release either ON/OFF pad.

6.If YES was selected, the display should now read 2 LINES 16 CHARS AVAILABLE, and then SCROL THRU ALPHA, NEXT -> NEXT LETTER, and then WRITE TOP LINE ?. The ad can be up to 32 char- acters long, 16 per line. The ad will be written in two steps, first the top line, then the bottom line.

7.To write the top line of a new ad, press and release YES. To skip the top line and only write a bottom line, press and release NO and proceed to step 13.

8.The display will now read A with a flashing cursor below it. Press and hold the SCROLL button to scroll through the alphabet and available characters. When the desired character is shown on the display, press and release NEXT to move to the next character in the top line.

9.Repeat step 8 until the top line is complete.

10.Press and release DONE. The display should now read WRITE BTM LINE?.

11.To write the bottom line of the new ad, press and release YES.

12.To skip the bottom line, press and release NO.

a.If neither a top nor bottom line was written, the display should now read ENABL CLEAN ?.

b.If only a top line was written, the ad will be displayed followed by SAVE? Proceed to step 16.

13.The display will now read A with a flashing cursor below it. Press and hold the SCROLL button to scroll through the alphabet and available characters. When the desired character is shown on the display, press and release NEXT to move to the next character in the bottom line.

14.Repeat step 13 until the bottom line is complete.

15.Press and release DONE. The display will now show the written ad, and then SAVE?

16.To cancel saving the ad, press and release NO. The display should now read ADVERTISEMENT NOT SAVED! and then will return to the WRITE TOP LINE ? screen.

17.To correct or edit the ad, press and release EDIT. The display should now read WRITE TOP LINE? Repeat steps 10 though 17.

18.To save the ad as it is shown, press and release YES. The display should now read ADVERTISEMENT SETUP COMPLETE, and then ENABL CLEAN. To exit programming and return to the MAIN SCREEN, press and release either ON/OFF pad.

Page 33

40119 071107

 

Image 33
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisTrademarks of Bunn-O-Matic Corporation BUNN-O-MATIC Commercial Product WarrantyIntroduction ContentsUser Notices 400/230V volt ac three phase 50/60 Hz models Electrical RequirementsElectrical HOOK-UP Plumbing Requirements CE RequirementsPlumbing Hook UP Tank DrainOperating Controls Initial SET-UP Viewing Asset & Serial NumberTank Filling until tank is filled with water Coffee Brewing Cleaning Glossary Programming Switches ProgrammingProgramming Section Programming the Brewer Programming Lockout SwitchImportant Programming Notes Read Carefully ScreenProgramming Functions Level Programming the BrewerProgramming Functions Level Brew Lockout Procedure for setting Brew LockoutProcedure for setting Language Programming the Brewer Programming Functions Level 2SET Language Units Procedure for setting the UnitsSET Temp Ready Temp Procedure to set ready temperature Range 2 to 20 F 2 to 10 CBrew Settings Procedure to set or modify brew volumes. Range 10 to 500 ozNext Ton until display reads Brew Settings ? Press and release the right hidden button untilPress YES to proceed. The display should now Batches DONE? SET Pulse BREW/PREINFUSION Setting Pulse BrewOFF Time XXX Done + Drip Time Review Settings ?LEFT---- Right Are YOU Sure ?Copy Settings ? No YES Range 0 to RefillSpray OZ/M Procedure to adjust the sprayhead flow rate set- tingBypass OZ/M Procedure to adjust the bypass flow rate settingProcedure to calibrate the sprayhead flow rate Calibrate FlowRepeat steps 1-7 to calibrate the other side Repeat steps 1-7 to calibrate the other side Brew Counters Procedure to view/reset the brew countersProcedure to Enable/Disable Ads Enable ADSSAVE? No Edit YES Advertisement Setup Complete Procedure for enabling clean Range 0.0 to 72.0 hrs Enabl CleanEnable Energysavr TimerDone Enable Fresh Timer Asset Number Procedure to enter the asset numberEnter Asset #? Press and release YES. The display will now readProcedure to enter the service number Service NumberEnter Service #? Service TOOLS?Service Tools Procedure to test components and outputsTest Switches Service TOOLS? No YES Left Hidden DonePressed Quency Factory Defaults Procedure to set factory defaultsYOU SURE? Factory Default Values Troubleshooting Problem TroubleshootingProbable Cause RemedyTest switch procedures on Problem Probable Cause RemedyBrew valve Control BoardRefill probe or Sensitivity set LongTing Obstructions. Clear or replace Refill valve If the left three digit numberProblem Probable Cause Control Board ON/OFF SwitchAutomatic refill will not operate or Ting Water flows into tank continuously Refill valveTo it is secure Foreign material lodged in valveHeating Time TOO Long No bypass water Bypass valve Test outputs procedures onLime buildup Sprayhead or air ventInconsistent beverage level Improper water pressure Brew volume adjustmentServer/dispenser 90 psi 138 and 620 kPaFor proper extraction Tank heaters Remove and clean lime off tank HeatersSolenoids Vibrate during operationWeak beverage Type of paper filter Water temperatureCoffee Proper extractionSchematic Wiring Diagram Schematic Wiring Diagram Titan Dual CE

TITAN DUAL specifications

The Bunn TITAN DUAL is a commercial coffee brewer designed to deliver high-quality coffee with efficiency and consistency. Made for establishments that prioritize both speed and taste, the TITAN DUAL stands out with a variety of features that enhance its usability and performance.

One of the significant features of the Bunn TITAN DUAL is its dual brewing capability, which allows users to brew two separate batches of coffee simultaneously. This is particularly beneficial for busy cafes and restaurants that need to meet high customer demand during peak hours. The brewer can support various batch sizes, empowering users to customize their brewing to match the needs of their business, whether it’s a quick single cup or several gallons at once.

The Bunn TITAN DUAL employs advanced brewing technology, including NitroCold Brew options that create a smooth, cold coffee with a unique flavor profile. This technology allows for the extraction of rich flavors while maintaining a refreshing finish, catering to modern coffee trends that demand versatility.

Another notable feature is the integrated digital brewing controls. The intuitive interface allows baristas to set precise brew times and temperatures, ensuring that each cup of coffee is consistently high quality. With programmable features, coffee shops can optimize their brewing processes, reducing waste while maximizing flavor.

The TITAN DUAL is designed for ease of maintenance, with removable parts that simplify cleaning and servicing. This ensures that the brewer can remain operational with minimal downtime, an essential aspect for any commercial kitchen environment. The stainless steel construction promises durability, making it an investment that can withstand the rigors of daily use.

Additionally, the Bunn TITAN DUAL reportedly has a high-capacity water tank, which ensures quick recovery time between brews. This feature is crucial during busy service times, as it allows for rapid preparation of coffee without long waiting periods.

With energy efficiency in mind, the brewer is designed to quickly heat water to the optimal temperature. This not only benefits the environment but also helps reduce operating costs over time.

In summary, the Bunn TITAN DUAL is an advanced commercial coffee brewer engineered for speed, efficiency, and quality. Its dual brewing capabilities, advanced technologies, and user-friendly features make it a valuable addition to any coffee-focused business, ensuring that customers receive a consistent and satisfying coffee experience.