Bunn FMD-3 service manual Solenoid Valve Cold Water Optional, Cold Water Solenoid Valve

Page 29

SERVICE (cont.)

SOLENOID VALVE (COLD WATER - OPTIONAL)

P1445.40

FIG. 26 COLD WATER SOLENOID VALVE

Location:

The cold water solenoid valve is located on the left side of the dispenser base just behind the com- ponent bracket.

Test Procedures:

1.Disconnect the dispenser from the power source.

2.Disconnect the white and white/yellow wires from the solenoid valve. With the “HOT/COLD” switch in the "COLD" upper position press the left dispense switch on front of the door.

3.Check the voltage across the white and white/ yellow wires with a voltmeter. Connect the dis- penser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208, 120/240 volt models and 240 volts ac for two wire 240 volt models.

4.Disconnect the dispenser from the power source.

If voltage is present as described, proceed to #5

If voltage is not present as described, refer to wiring diagram and check dispenser wiring harness.

5.Check for continuity across the solenoid valve coil terminals.

If continuity is present as described, reconnect the white and white/yellow wires to the solenoid.

If continuity is not present as described, replace the solenoid valve.

6.Check the solenoid valve for coil action. Connect the dispenser to the power source. With "HOT/ COLD" switch in the "COLD" upper position press the left dispense switch and listen carefully in the vicinity of the solenoid valve for a "clicking" sound as the coil magnet attracts.

7.Disconnect the dispenser from the power source.

If the sound is heard as described and water will not pass through the solenoid valve, there may be a block- age in the water line before the solenoid valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles.

If the sound is not heard as described, replace the solenoid valve.

Removal and Replacement:

1.Loosen the two screws securing the component bracket to the dispenser base. Lift the compo- nent bracket off of the base and move to the right.

1.Remove the white and white/yellow wires from the solenoid valve.

2.Turn-off the water supply to the dispenser.

3.Disconnect the water lines to and from the sole- noid valve.

4.Loosen the two #8-32 screws and washers se- curing the solenoid mounting bracket to the base. Remove solenoid bracket and solenoid valve as an assembly.

5.Remove the two #10-32 screws and lockwashers securing the solenoid valve to the solenoid bracket.

6.Using two #10-32 screws and lockwashers in- stall new solenoid valve on solenoid mounting bracket.

7.Install the solenoid valve and bracket on the dis- penser base and tighten the two #8-32 screws.

29

28364 011598

 

Image 29
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisFMD-2 FMD-3 BUNN-O-MATIC Commercial Product Warranty28368.0000 00656.0000 00831.000026536.0002 FMD-2Initial SET-UP Plumbing HOOK-UP Initial Fill & HeatDraining the HOT Water Tank Remedy Problem Probable CauseStat for testing procedures. See TroubleshootingReplacement Control thermostat Dripping from dispense tip Lime build-up Product overflows container Dispense switchLeaks ColdProbable Cause Remedy ProblemDispenser is making unusual Refer to Service Lamp, see page 23 for lamp replacementNoises Water Supply Tank Heater Excess dust Fan Display not lit Lamp Lamp Holder Starter Lamp BallastAuger Drive Components Component AccessContents If voltage is present as described, proceed to #5 Hopper Lid Auger Wire Agitator Disc AssyOff of the auger drive shaft Auger Drive Shaft Optional Bushing Ejector ElbowRemove dust seal 18 from auger motor Auger Drive ComponentsHarness BLK to BLU From Door Interconnect Refer to when reconnecting the wiresBallast Control Thermostat Remove temperature probe from the tankLocation Dispense SwitchControl Thermostat Location Dispense SwitchFAN Frother and Whipper Motor FANSteam Collector Ring Mixing Chamber #8-32 Acorn Nut Washer Ring Nut FrotherFrother and Whipper Motor Whipper Motor Terminals P1451.40 Hopper Delay BoardDisconnect the wires from the switch termi- nals HOT/COLD Switch OptionalLamp Holder Lamp Replacement Refer to FigDoor Assy Upper Panel Lamp Holders Lower Panel Remove the outside window and display graphicLevel Control Board and Level Probe As assemblyLamp Starter and Socket Level Control Board and Level Probe Limit Thermostat Limit ThermostatBoard Overflow Protection SwitchFrom Main Harness RINSE/RUN Switch Rinse /RUN SwitchCold Water Solenoid Valve Solenoid Valve Cold Water OptionalSolenoid Valves Dispense Cold Water Solenoid TerminalsSolenoid Valve Inlet Solenoid Valves DispenseTank Heater Solenoid Valve InletTank Heater Main Wiring Thermostat HarnessTank Heater Switch Tank Heater Switch Terminals Tank Heater SwitchSchematic Wiring Diagram FMD-1, FMD-2, & FMD-3 Schematic Wiring Diagram FMDA-1, FMDA-2, & FMDA-3