Bunn FMD-3 service manual Level Control Board and Level Probe

Page 25

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE (cont.)

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to the wiring diagram and check the dispenser wiring haness.

5.

Reconnect the violet wire to terminal 1.

6.

Carefully connect a piece of insulated jumper wire

 

to terminal 4. Keep the other end of this wire away

 

from any metal surface of the dispenser.

7.

Check the voltage across terminals 1 & 3 with a

 

voltmeter. Connect the dispenser to the power

 

source. The indication must be 120 volts ac for two

 

wire 120 volt models, three wire 120/208 volt

 

models, three wire 120/240 volt models and 240

 

volts ac for two wire 240 volt models after a delay

 

of approximately 5 seconds.

8.

Touch the free end of jumper wire to the dispenser

 

housing. The indication must be 0.

9.

Move the jumper wire away from the dispenser

 

housing. The indication must again be 120 volts ac

 

for two wire 120 volt models, three wire 120/208

16.Move the probe's flat end away from the dispenser housing. The indication should again be 120 volts ac for two wire 120 volt models, three wire 120/ 208 volt models, three wire 120/240 volt models and 240 volt ac for two wire 240 volt models after a delay of approximately 5 seconds.

If voltage is present as described, reinstall the probe, the level control board and level probe are operating properly.

If voltage is not present as described, check the pink probe wire for continuity.

Removal and Replacement:

1.Remove all wires from the level control board.

2.Remove two #8-32 keps nuts holding level control board to right side of the component bracket.

3.Remove level control board and spacers.

3.Install the new level control board and spacers to the right side of the component bracket using two #8-32 keps nuts.

4.Refer to Fig. 19 when reconnecting the wires.

volt models , three wire 120/240 volt models and

240 volts ac for two wire 240 volt models after a

delay of approximately 5 seconds.

10. Disconnect the dispenser from the power source

and remove the jumper wire from terminal 4.

If voltage is present as described, the level control board is operating properly, proceed to #11.

If voltage is not present as described, replace the level control board.

11.Reconnect the pink wire to terminal 4.

12.Gently pull the probe out of the tank lid and inspect for corrosion. Replace it if necessary.

13.Place the probe so that neither end is in contact with any metal surface of the dispenser.

14.Check the voltage across terminals 1 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models and 240 volts ac for two wire 240 volt models after a delay of approximately 5 seconds.

15.Move the probe's flat end to the dispenser hous- ing. The indication must be 0.

T1 VIO to Inlet

Solenoid Coil

T2 BLU to Overflow

Protection Switch

T3 WHI to Main

Harness

T4 PNK to Probe

GRN to Tank

FIG. 19 LEVEL BOARD TERMINALS

P1455

25

28364 011598

 

Image 25
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisFMD-2 FMD-3 BUNN-O-MATIC Commercial Product Warranty28368.0000 00656.0000 00831.000026536.0002 FMD-2Initial SET-UP Plumbing HOOK-UP Initial Fill & HeatDraining the HOT Water Tank Remedy Problem Probable CauseReplacement Control thermostat TroubleshootingStat for testing procedures. See Dripping from dispense tip Lime build-up Product overflows container Dispense switchLeaks ColdProbable Cause Remedy ProblemDispenser is making unusual Refer to Service Lamp, see page 23 for lamp replacementNoises Water Supply Tank Heater Excess dust Fan Display not lit Lamp Lamp Holder Starter Lamp BallastContents Component AccessAuger Drive Components If voltage is present as described, proceed to #5 Hopper Lid Auger Wire Agitator Disc AssyOff of the auger drive shaft Auger Drive Shaft Optional Bushing Ejector ElbowRemove dust seal 18 from auger motor Auger Drive ComponentsBallast Refer to when reconnecting the wiresHarness BLK to BLU From Door Interconnect Control Thermostat Remove temperature probe from the tankControl Thermostat Dispense SwitchLocation FAN Dispense SwitchLocation Frother and Whipper Motor FANSteam Collector Ring Mixing Chamber #8-32 Acorn Nut Washer Ring Nut FrotherFrother and Whipper Motor Whipper Motor Terminals P1451.40 Hopper Delay BoardDisconnect the wires from the switch termi- nals HOT/COLD Switch OptionalLamp Holder Lamp Replacement Refer to FigDoor Assy Upper Panel Lamp Holders Lower Panel Remove the outside window and display graphicLamp Starter and Socket As assemblyLevel Control Board and Level Probe Level Control Board and Level Probe Limit Thermostat Limit ThermostatFrom Main Harness Overflow Protection SwitchBoard RINSE/RUN Switch Rinse /RUN SwitchCold Water Solenoid Valve Solenoid Valve Cold Water OptionalSolenoid Valves Dispense Cold Water Solenoid TerminalsSolenoid Valve Inlet Solenoid Valves DispenseTank Heater Solenoid Valve InletTank Heater Switch Main Wiring Thermostat HarnessTank Heater Tank Heater Switch Terminals Tank Heater SwitchSchematic Wiring Diagram FMD-1, FMD-2, & FMD-3 Schematic Wiring Diagram FMDA-1, FMDA-2, & FMDA-3