Bunn LCA-2 LCC-2 manual Replacing the Pump Tubing

Page 20

REPLACING THE PUMP TUBING

The pumps and tubing used in the dispenser are designed to give maximum performance and long life. However, the tubes are a wear item and must be replaced periodically. How long the tubes last is dependent on usage and properties of the concentrate. Excessive wear will reduce the output of the pumps resulting in a weak mixed beverage. Bunn-O-Matic recommends replacing the Pump Tubing a minimum of once every 6 months or sooner if warranted.

Refer to the Tube Replacement Instruction on the Cabinet door for details.

1.Rinse the pump tubing with warm tap water (Refer to steps 1 - 5 of the Weekly Sanitizing instructions) prior to removing the tubes to avoid concentrate spills.

2.Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set it and the retainer plate aside.

3.Depress the tension screw and remove it from the notch in the pump housing, releasing the spring tension on the pump band.

4.Open the compression band and gently pull the pump tube from around the pump’s rotor.

5.Inspect the pump bands for signs of wear. Replace if necessary.

6.Apply lubricant (BUNN-O-MATIC part number M2548.1000) to the new pump tubing’s rotor side.

7.Insert the tube onto the mix chamber port, then wrap the new tubing around the pump rotor, making sure that the elbow and clamps end up on the bottom side of the pump housing.

8.Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump band.

9.Replace the tubing retainer plate and tighten the thumbscrew.

10.Repeat steps 1 through 9 for the other pump.

Thumbscrew

2.0"

Tension2.0"

Screw

Lubricate between arrows

Remove Retaining Plate Release Spring Tension

Remove Tubing

Lubricate New Tube

Tension Screw

Tube Clamp

Install New Tubing

Completed Installation

20

34766 112502

 

Image 20
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 529-6601 FAX 217Contents User Notices Optional Field WiringIntroduction Plumbing Requirements Field Wiring Terminal Block DiagramElectrical Requirements Plumbing HOOK-UP Initial SET-UPElectrical HOOK-UP Reprogramming the Dispenser Flow Rate Setting Dispenser Flow RateRemoving the restrictors Tube Selection Chart Selecting the Correct Pump TubingDispense RateOperating Controls and Interface 1513Initial Fill & Heat FlavorGard Feature Rinse Alarm Feature Brew Temperature Lockout FeatureProgramming the Dispenser 351 +SET RT Tube Size Exit 3/16RT Disp Volume LF Product Disp 0GAL RESET? RT Product DispEnter Password Ready TempCAL LF WTR Flow Pull Dispenser Action DescriptionRinse Time ? 12 Hrs + Menu Screen Action CAL Right Pump ? Pull DispenserCAL RT WTR Flow Pull Dispenser CAL Right Side ? Exit YESWTR Start Delay WTR Stop DelayFactory Defaults No YES Action Description Menu ScreenLoading the Concentrate Priming the Concentrate LinesOperating the Dispenser Cleaning & Preventative Maintenance General Cleaning and Sanitizing ProceduresReplacing the Pump Tubing Draining the HOT Water Tank Troubleshooting Front Panel LED Display MessagesTroubleshooting Dispenser Diagnostics Screen Displayed Possible CauseScreen Displayed 22 ml Calibrating the Left Side Dispenser47 ml Field Calibrating the Empty BIB Warning Oz/sec 53 ml/sec w/ flow restrictorOz/sec 74 ml/sec w/o flow restrictor Calibrating the Right Side DispenserSchematic Wiring Diagram LCA-2, LCA-2C,LCC-2,LCC-2C Schematic Wiring Diagram LCC-2A/LCA-2A

LCA-2 LCC-2 specifications

The Bunn LCA-2 and LCC-2 are prominent models in the realm of commercial coffee brewing systems, known for their efficiency, reliability, and innovative technologies. Designed for coffee shops, restaurants, and catering services, these machines provide exceptional performance to meet the demands of high-volume coffee brewing.

One of the main features of both the LCA-2 and LCC-2 is their brewing capacity. The LCA-2 is capable of brewing up to 7.5 gallons of coffee per hour, while the LCC-2 can brew up to 13.5 gallons per hour. This high output makes them ideal for busy environments where quick service is essential. The machines are designed to brew directly into airpots or decanters, allowing for seamless service and easy coffee transportation.

Another standout characteristic is the precise water temperature control. The Bunn LCA-2 and LCC-2 utilize advanced brewing technology that ensures water is heated to the optimal temperature of 195°F to 205°F. This precision is crucial for maximizing flavor extraction and producing a quality cup of coffee consistently. Additionally, the machines feature an electronic brew timer, which allows users to regulate brewing time and ensure that every batch meets the desired flavor profile.

The build quality of these machines is also noteworthy. Constructed from durable stainless steel, the LCA-2 and LCC-2 are engineered to withstand the rigors of a commercial environment, assisting in maintaining consistent performance over time. Their sleek and professional design not only enhances the aesthetic appeal of any coffee service area but also facilitates easy cleaning and maintenance.

Furthermore, both models are equipped with a user-friendly control panel, providing operators with intuitive functionalities. The simple interface allows for quick adjustments, providing flexibility to customize brewing settings that suit different coffee varieties and customer preferences.

In terms of energy efficiency, the Bunn LCA-2 and LCC-2 are designed to minimize energy consumption without compromising performance. They feature a built-in tank that keeps water ready for brewing, drastically reducing the wait times between brews and ensuring that coffee is always available when needed.

In summary, the Bunn LCA-2 and LCC-2 stand out in the commercial coffee brewing segment, offering an impressive combination of high brewing capacity, precision temperature control, durable construction, and user-friendly operation. These features make them excellent choices for any establishment seeking to enhance their coffee service efficiently and effectively.