Hoshizaki KM-650MAH instruction manual Startup

Page 25

I. Startup

WARNING

1.All parts are factory-adjusted. Improper adjustments may adversely affect safety, performance, component life, and warranty coverage.

2.If the icemaker is turned off, wait for at least 3 minutes before restarting the icemaker to prevent damage to the compressor.

3.To prevent damage to the water pump seal, do not operate the icemaker with the control switch in the "WASH" position when the water tank is empty.

4.At startup, confirm that all internal and external connections are free of leaks.

5.On remote air-cooled model, the icemaker should have power for a minimum of 4 hours prior to startup to prevent compressor damage.

1)Open the water supply line shut-off valve(s).

2)Remove the front panel.

3)Move the control switch on the control box to the "ICE" position.

4)Replace the front panel in its correct position.

5)Turn on the power supply, and allow the icemaker to operate for a total of 10 minutes.

6)Turn off the power supply, then remove the front panel.

7)Remove the base cover, then disconnect one end of the pump tubing to drain the water tank. See Fig. 14.

8)After the water tank has drained, reconnect the pump tubing.

9)Clean the storage bin liner using a neutral cleaner. Rinse thoroughly after cleaning.

10)Replace the base cover and the front panel in their correct positions.

11)Turn on the power supply to start the automatic icemaking process.

12)To confirm bin control operation, press and hold the bin control's actuator paddle during the first 5 minutes of the freeze cycle. The icemaker should shut down in approximately 15 seconds.

Disconnect This

End of Pump

Tubing to Drain

Water Tank

Base Cover

Fig. 14

25

Image 25
Contents KM-650MAH KM-650MWH KM-650MRH Hoshizaki AMERICA, INC Contents Important Safety Information KM-650MAH air-cooled Specifications Nameplate RatingMAX. Hacr Breakerusa only Amps KM-650MWH water-cooledKM-650MRH remote air-cooled KM-650MAH Dimensions / ConnectionsKM-650MWH KM-650MRH Checks Before Installation II. Installation and Operating InstructionsHow to Remove Panels See Fig Location SetupFor All Models Electrical ConnectionAdditional Warnings for Remote Air-Cooled Model Checks Before Installation Installation of Remote Condenser UnitLocation Line Set SetupField Fabricated Line Set Installation Ester Electrical Connection Stacking Remote Condenser Units See , 12, or Water Supply and Drain ConnectionsIcemaker KM-650MAH and KM-650MRHConnection to an Open Drain System Water-Cooled CondenserKM-650MWH Final Checklist Startup Cleaning and Sanitizing Instructions III. Cleaning and MaintenanceCleaning Procedure Sanitizing Procedure Following Cleaning Procedure Stainless Steel Exterior MaintenanceStorage Bin and Scoop Air Filters air-cooled modelRemove the water from the icemaker water supply line Preparing the Icemaker for Long StorageDrain the water tank Page Hoshizaki AMERICA, INC
Related manuals
Manual 54 pages 14.7 Kb