Hoshizaki KM-1300MRH, KM-1300MWH Removal and Replacement of HOT GAS Valve and Line Valve

Page 47

12)Replace the panels in their correct positions.

13)Turn on the power supply.

6.REMOVAL AND REPLACEMENT OF HOT GAS VALVE AND LINE VALVE

IMPORTANT

Always use a copper tube of the same diameter and length when replacing the hot gas lines; otherwise the performance may be reduced.

IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the screw and the Solenoid.

5)Disconnect the Hot Gas Valve or Line Valve using brazing equipment.

6)Install the new valve.

CAUTION

Always protect the valve body by using a damp cloth to prevent the valve from overheating. Do not braze with the valve body exceeding 250°F.

7)Install the new Drier.

8)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

9)Evacuate the system, and charge it with refrigerant. For air-cooled and water- cooled models, see the Nameplate for the required refrigerant charge. For remote air-cooled models, see the Charge Label in the machine compartment.

47

Image 47
Contents KM-1300MAH KM-1300MWH KM-1300MRH Hoshizaki AMERICA, INC Contents Maintenance KM-1300MAH Air-cooled Specifications2a. KM-1300MWH Water-cooled 2b. KM-1300MWH Water-cooled Serial No. M10156D KM-1300MRH Remote air-cooled Condensing Unit URC-12F Specifications Model URC-12F II. General Information Construction KM-1300MWH Water-cooled KM-1300MRH Remote air-cooled Controller Board Features of Control Products E Controller BoardController Board SOLID-STATE ControlPage Freeze Cycle Beep every 3 sec. = High Evaporator Temperature 127 FMinute Fill Cycle Harvest CycleControl Products HOS-001A Board Sequence 1st Cycle 2nd Cycle and after with pump drain 2nd Cycle and after with no pump drain Controls and Adjustments Setting Time Setting Frequency Checking the Controller Board Page III. Technical Information KM-1300MWH Water-cooled KM-1300MRH Remote air-cooled KM-1300MAH Air-cooled and KM-1300MWH Water-cooled Wiring DiagramsCut-out 412 ±21.3 Psig Cut-in 327±21.3 Psig Timing Chart Page Performance Data Serial # L00001F to M10155C KM-1300MWH Water-cooled Serial # M10156D KM-1300MRH Remote air-cooled Problem Possible Cause Remedy IV. Service Diagnosis No ICE ProductionController Board Problem Possible Cause Remedy LOW ICE Production Evaporator is Frozen UPOthers Abnormal ICEEvacuation and Recharge R-404A Service for Refrigerant LinesRefrigerant Recovery Brazing Removal and Replacement of Compressor Important Removal and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of HOT GAS Valve and Line Valve Removal and Replacement of Evaporator Important Page Page Page Removal and Replacement of Thermistor Important Removal and Replacement of FAN Motor Removal and Replacement of Pump Motor Removal and Replacement of Water ValveRemoval and Replacement of Spray Tubes Preparing the Icemaker for Long Storage VI. Maintenance and Cleaning InstructionsPage Cleaning Cleaning Procedure Sanitizing Procedure Following Cleaning Procedure Page Maintenance