Hoshizaki F-80 I MWH (-c), F-80 I MAH (-c) service manual Removal and Replacement of Drier

Page 42
4. Removal and Replacement of Drier

14)Evacuate the system, and charge it with refrigerant. For the air-cooled and water-cooled models, see the nameplate for the required refrigerant charge and type. For the remote air- cooled models, see the label on the control box.

15)Connect the terminals to the compressor, and replace the terminal cover in its correct position.

16)Replace the panels in their correct position, and turn on the power supply.

4. Removal and Replacement of Drier

IMPORTANT

Always install a new drier every time the sealed refrigeration system is opened. Do not replace the drier until after all other repairs or replacement have been made.

1)Turn off the power supply, and remove the panels.

2)Recover the refrigerant and store it in an approved container, if required by an applicable law.

3)Remove the drier using brazing equipment.

4)Install the new drier with the arrow on the drier in the direction of the refrigerant flow. Use nitrogen gas at the pressure of 3 - 4 PSIG when brazing the tubings.

5)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

6)Evacuate the system, and charge it with refrigerant. For the air-cooled and water-cooled models, see the nameplate for the required refrigerant charge and type. For the remote air-cooled models, see the label on the control box.

7)Replace the panels in their correct position, and turn on the power supply.

42

Image 42
Contents Modular Flaker Models F-801MAH-C F-801MWH-C Number Issued Revised“A Superior Degree of Reliability” HoshizakiHoshizaki America, IncHOSHIZAKI AMERICA, INC 618 Highway 74 South Peachtree City, GA Phone 1-800-233-1940 Technical Service 770 487-2331 FaxComplete and detailed explanation of the problem Attn HOSHIZAKI Technical Support DepartmentCONTENTS 8. Removal and Replacement of Fan Motor 5. Removal and Replacement of Expansion Valve7. Removal and Replacement of Evaporator Assembly 9. Removal and Replacement of Control Water ValveI. Specification 1. Icemaker F-801MAHF-801MWH F-801MAH-C F-801MWH-C II. General Information 1. Construction F-801MAH/-CF-801MWH/-C Water Supply Inlet Junction Box Water Regulator Compressor Drier2. Control Box Layout GEAR MOTORCONTROL TIMER FLUSHRUN CAPACITOR III. Technical Information 1. Water Circuit and Refrigeration Circuit F-801MWH/-C 2. Wiring Diagrams F-801MAH/-C, F-801MWH/-C3. Sequence of Electrical Circuit b When reservoir has been filled, gear motor starts immediately c Compressor starts about 60 sec. after gear motor starts Page e Low water except water-cooled model Page Page h When flush timer operates for 15 min. every 12 hours Page Page 4. Timing Chart Miswiring. Circuit Protect Relay operatesProper wiring. The unit starts 150 sec 1 sec60 sec 1. CIRCUIT PROTECT RELAY 2. WATER LEVEL UPPER 3. FLOAT SWITCH LOWER 5. Performance Data WATER FLOW FOR CONDENSER F-801MAH-C F-801MWH-C IV. Adjustment of Components 1. Adjustment of Water Regulating Valve water-cooled model only2. Adjustment of Flake Size POSSIBLE CAUSE V. Service Diagnosis 1. No Ice ProductionPROBLEM REMEDYPROBLEM POSSIBLE CAUSE PROBLEM2. Low Ice Production REMEDY3. Other a Refrigerant Recovery VI. Removal and Replacement of Components1. Service for Refrigerant Lines b Evacuation and Recharge R-404A2. Brazing DANGER 3. Removal and Replacement of Compressor 4. Removal and Replacement of Drier 5. Removal and Replacement of Expansion Valve Page Extruding Head 7. Removal and Replacement of Evaporator AssemblyCutter AugerBearing-Lower and Mechanical Seal Gear Motor28 Move the flush switch to the ICE position 27 When replacing the evaporatorc Check for leaks using nitrogen gas 140 PSIG and soap bubbles 30 Turn on the power supplyRubber O-ring Nylon Ring Bolt Washer Cutter Extruding Head Washer Auger Mechanical Seal O-ring Bearing Lower Bolt WasherCoupling - Spline Socket Head Cap Screw Evaporator Washer Socket Head Cap Screw Barrier8. Removal and Replacement of Fan Motor 9. Removal and Replacement of Control Water Valve10. Removal and Replacement of Flush Water Valve VII. Cleaning and Maintenance 1. Preparing the Icemaker for Long Storage2. Cleaning and Sanitizing Instructions a Cleaning Solutionb Cleaning Procedure c Sanitizing Solution d Sanitizing Procedure - Initiale Sanitizing Procedure - Final 21 Flush out any solution from the storage bin 18 Move the flush switch to the “ICE” position and run the icemaker19 Turn off the power supply after 30 minutes 22 Turn on the power supply and start the automatic icemaking process3. Maintenance 3 Air Filter air-cooled model only 4 Condenser except water-cooled model