Scotsman Ice service manual SCCG30 & SCCP30

Page 28

15.Lift evaporator platen up and tilt back enough for bin assembly to clear the base.

SCCG30 & SCCP30

Service Manual

18.Remove 1 screw at each corner of the base.

19.Lift bin assembly off the base.

Note: Prop evaporator assembly up. A 3' length of 3/4" PVC tubing with one end inserted into the cup mold and the other against the base will hold it up.

The hot gas valve, fan motor, condenser and compressor are now exposed for service.

16. Remove air baffle.

Air Baffle

17. Unplug wire harness connector (at back of bin).

September 2009

Page 28

Image 28
Contents Table of Contents IntroductionSpecifications LEG Adjustment Places Drain Flexible Tubing Cabinet LayoutAir flow Water Quality Installation OverviewFilters and Treatment Door Covering Door Panel Custom PanelDoor Panel Attachment Custom Panel Installation Notes Door swing changeInstallation Water & Drain Drain Pump Model drain installationGravity Drain Electrical & Start Up Installation check listInitial Start Up Cube Size Adjustment Side Views of CubesHarvest Time Adjustment Use How to clean the condenser and winterize Condenser cleaningHow to remove scale from the ice making system Overall System InformationElectrical Components Water System Components Performance Information Refrigeration System Service Diagnosis Problem Likely Cause Probable SolutionMakes excessive noise Removal and Repair Harvest Timer Cube Size ThermostatRemoval and Repair Cabinet Removal SCCG30 & SCCP30 Refrigeration Service