15.Lift evaporator platen up and tilt back enough for bin assembly to clear the base.
SCCG30 & SCCP30
Service Manual
18.Remove 1 screw at each corner of the base.
19.Lift bin assembly off the base.
Note: Prop evaporator assembly up. A 3' length of 3/4" PVC tubing with one end inserted into the cup mold and the other against the base will hold it up.
The hot gas valve, fan motor, condenser and compressor are now exposed for service.
16. Remove air baffle.
Air Baffle
17. Unplug wire harness connector (at back of bin).
September 2009
Page 28