GE 200D9366P004 operating instructions Shut OFF the Main Water Supply, Choose the Valve Location

Page 29

Installation Instructions

WHAT YOU WILL NEED (CONT.)

NOTE: The only GE approved plastic tubing is that supplied in GE SmartConnectRefrigerator Tubing kits. Do not use any other plastic water supply line because the line is under pressure at all times. Certain types of plastic will crack or rupture with age and cause water damage to your home.

A GE water supply kit (containing tubing, shutoff valve and fittings listed below) is available at extra cost from your dealer or from Parts and Accessories, 800.626.2002 (in Canada 1.888.261.3055).

A cold water supply. The water pressure must be between 20 and 120 p.s.i. (1.4–8.1 bar).

Power drill.

1/2or adjustable wrench.

Straight and Phillips blade screwdriver.

Two 1/4outer diameter compression nuts and 2 ferrules (sleeves)—to connect the copper tubing to the shutoff valve and the refrigerator water valve.

OR

If you are using a GE SmartConnectRefrigerator Tubing kit, the necessary fittings are preassembled to the tubing.

If your existing copper water line has a flared fitting at the end, you will need an adapter (available at plumbing supply stores) to connect the water line to the refrigerator OR you can cut off the flared fitting with a tube cutter and then use a compression fitting. Do not cut formed end from GE SmartConnectRefrigerator tubing.

Shutoff valve to connect to the cold water line.

The shutoff valve should have a water inlet with a minimum inside diameter of 5/32at the point of connection to the COLD WATER LINE. Saddle- type shutoff valves are included in many water supply kits. Before purchasing, make sure a saddle-type valve complies with your local plumbing codes.

Install the shutoff valve on the nearest frequently used drinking water line.

1SHUT OFF THE MAIN WATER SUPPLY

Turn on the nearest faucet long enough to clear the line of water.

2CHOOSE THE VALVE LOCATION

Choose a location for the valve that is easily accessible. It is best to connect into the side of a vertical water pipe. When it is necessary to connect into a horizontal water pipe, make the connection to the top or side, rather than at the bottom, to avoid drawing off any sediment from the water pipe.

3DRILL THE HOLE FOR THE VALVE

Drill a 1/4hole in the water pipe (even if using a self-piercing valve), using a sharp bit . Remove any burrs resulting from drilling the hole in the pipe.

Take care not to allow water to drain into the drill.

Failure to drill a 1/4hole may result in reduced ice production or smaller cubes.

29

Image 29
Contents Write the model and serial numbers here Model # Serial # Ge.comRefrigerator or Freezer Before You Throw Away Your OldGe.com HOW to Connect ElectricityAbout the controls with temperature settings Installing the Filter Cartridge When to Replace the FilterAbout the water filter. on some models Water Filter CartridgeAbout the shelves and bins Non-Adjustable Shelves on the Door on some modelsRearranging the Shelves To removeFruit and Vegetable Crisper Adjustable Humidity Crisper on some modelsAbout the crispers and pans About the freezer drawer. on some models When replacing the deep full-width basketFreezer Shelves and Baskets Basket RemovalAbout the freezer compartment. on some models Non-Adjustable Shelf on Freezer DoorFreezer Shelf and Basket Fixed Shelf RemovalTo reach the icemaker power switch, pull Icemaker Accessory KitAbout the automatic icemaker. on some models Automatic IcemakerCleaning the Inside Care and cleaning of the refrigeratorCleaning the Outside Preparing to Move Behind the RefrigeratorPreparing for Vacation Freezer Light Replacing the light bulbsRefrigerator Lights Preparation Before YOU BeginTools YOU MAY Need Moving the Refrigerator IndoorsRefrigerator Location Connecting the Refrigerator to the House Water LineClearances Removetop CAP cont. on some modelsTurn on the Water Supply ContPlug in the Refrigerator PUT Therefrigerator in PlaceRemove the Freezerdoorhandle Remove the Fresh Food Door HandleAttach the Freezerdoorhandle Attach the Fresh Food Door HandleLeveling legs have 2 purposes SET the ControlsRemovethedrawerfront RemovethebasketRemovethedrawerfront Remove the Base GrilleAttachand Securethedrawer Front Totheslides Replace the Freezer BasketImportant Notes Reversingthedoorswing Single Door Refrigerator Models onlyTools YOU will Need Removethe Refrigerator DoorRemove Bottom Hinge and Leveling LEG Remove the Freezer DoorTransfer Center Hinge Bracket Transfer Refrigerator Doorhandle Toright RehangfreezerdoorDouble Door Refrigerator Models only Install the Logo BadgeRehangrefrigeratordoor Removetherefrigerator Doors Removing the Doors Double Door Refrigerator Models onlyRemovecenterhinge Removeopposite DoorRehangrefrigeratordoors Install CenterhingeReplaceopposite Door Align Double DoorsWhat YOU will Need Installing the Water Line Icemaker ModelsDrill the Hole for the Valve Shut OFF the Main Water SupplyChoose the Valve Location Connect the Tubing to the Valve Fasten the Shutoff ValveTighten the Pipe Clamp Route the TubingNormal operating sounds Before you call for service…See About the controls Consumer Support Troubleshooting TipsSee Replacing the light bulbs Should be positioned vertically Handle is loose Handle needs adjustingWarranty Registration Department Box Louisville, KY GE Service Protection PlusModel Number Consumer Product Ownership RegistrationOwnership Registration Page What GE Will Not Cover GE Will ReplaceGE and Geprofilemodels One Year Thirty DaysTerms and Conditions What is not CoveredOperating Specifications Performance Data SheetGeneral Installation/Operation/Maintenance Requirements Special NoticesWater Treatment Device

200D9366P004 specifications

The GE 200D9366P004 is a high-performance component designed for various industrial applications, particularly in power generation and distribution systems. This device is a part of General Electric’s extensive lineup of electrical components, renowned for their durability and operational efficiency.

One of the main features of the GE 200D9366P004 is its robust design capacity, built to handle significant electrical loads while maintaining stability and safety. The component is engineered to comply with rigorous industry standards, ensuring not only reliability but also longevity in harsh operational environments. This makes it suitable for a range of applications, from power plants to critical infrastructure systems.

In terms of technologies, the GE 200D9366P004 incorporates advanced electric and electronic control systems that enhance its operational capabilities. This includes state-of-the-art monitoring technologies that provide real-time data on performance metrics, allowing for prompt detection of anomalies and facilitating proactive maintenance strategies. This predictive capability is crucial in minimizing downtime and extending the lifecycle of the equipment.

The operating characteristics of the GE 200D9366P004 are particularly noteworthy. It is designed for optimal thermal performance, ensuring that heat dissipation is managed efficiently. This helps in maintaining consistent performance even under high operational loads. Additionally, the component features advanced insulating materials that contribute to its reliability and efficiency, reducing the risks associated with electrical failures.

Another notable characteristic is its modular design, which simplifies installation and maintenance processes. This modularity allows for easier upgrades and repairs, making it a flexible choice for many organizations looking to enhance their operational efficiency without extensive downtime.

Overall, the GE 200D9366P004 stands out in the industrial landscape for its combination of advanced technology, rugged reliability, and operational efficiency. Whether utilized in power generation, industrial automation, or management of critical electrical infrastructure, this component exemplifies GE’s commitment to quality and innovation in electrical solutions, making it a preferred choice for professionals aiming to achieve high-performance standards in their operations.