Carrier 19EX, 17 installation instructions Front View, Plan View

Page 30

FRONT VIEW

Ð Area must be factory or ®eld insulated

Ð Area to be ®eld insulated, if ambient conditions require. NOTE: Waterbox covers are to be insulated by the contractor.

PLAN VIEW

IMPORTANT: 17EX insulation is identical to the 19EX insulation shown above. 17EX motors do not require insulation.

Fig. 24 Ð Typical Insulation Area (19EX Shown)

Copyright 1996 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, speci®cations or designs without notice and without incurring obligations.

Book

2

2

 

PC 211

Catalog No. 531-749

Printed in U.S.A.

Form 17/19EX-2SI

Pg 30

3-96

Replaces: 17/19EX-1SI

Tab

5a

5d

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 30
Contents Installation Instructions Contents Model Number Identication Typical 19EX Installation 19EXTypical 17EX Installation 17EX Front View 19EX Front ViewTypical Top View 19EX Shown Item no Torque Ft-lbHeat Condenser LENGTH² Width Height Tube PullComponent DIAMETER²² LENGTH²² Diameter Length Nozzle TypeDry Operating²² Refrigerant Water Condenser Total Weight Condenser ChargeRefrigerant Charge Dry Operating²² RefrigerantAuxiliary Connection Sizes Additional Cooler WeightsAdditional Condenser Weights CondenserCompressor Weights Total 19EX Motor Weights 60 HzTotal 19EX Motor Weights 50 Hz Total 17EX Drive Component WeightsÐ 17EX Motors Ð Total Weight, Lbs English Ð 17EX Motors Ð Total Weight, Kg SIMarine Waterbox Cover Weights NIH Waterbox Cover WeightsPsi KPa Cooler Sizes DimensionsCooler Sizes 31-33 Ft-in 31-33Machine Vibration Isolation Connect Piping Cooler Waterbox NOZZLE-IN-HEAD WaterboxesFrame 3 and 5 Marine Waterboxes Pass Out ArrFrame 4 Marine Waterboxes Pumpout UnitWater Piping, Oil Cooler to Chilled Water Circuit Typical Relief Valve Locations and Data ValvesIndividual Component Ratings PH-HZGeneral Page General Oil Pump Wiring 19EX Shown8772 02525Insulation Requirements 11¤8 Foam Tubing 15¤819EX Chillers Front View Plan ViewInstallation START-UP Request Checklist Testing YES/NO Date to be Completed