Carrier 19EX, 17 installation instructions Machine Vibration Isolation

Page 16

SOLEPLATE ISOLATION

TYPICAL ISOLATION

ACCESSORY ISOLATION

SOLEPLATE DETAIL

SECTION A-A

NOTES:

1. Dimensions in ( ) are in millimeters.

2.Accessory soleplate package includes 4 soleplates, 16 jacking screws and leveling pads. Requires isolation package.

3.Jacking screws to be removed after grout has set.

4.Thickness of grout will vary, depending on the amount necessary to level chiller. Use only pre-mixed non-shrinking grout, Celcote HT-648 or Master Builders 636, 0 -11¤2(38.1) to 0 -21¤4(57) thick.

STANDARD ISOLATION

VIEW B-B

ISOLATION WITH ISOLATION PACKAGE ONLY

(STANDARD)

NOTE: Isolation package includes 4 shear ¯ex pads.

Fig. 11 Ð Machine Vibration Isolation

16

Image 16
Contents Installation Instructions Contents Model Number Identication Typical 19EX Installation 19EXTypical 17EX Installation 17EX Front View 19EX Front ViewTypical Top View 19EX Shown Item no Torque Ft-lbCondenser LENGTH² Width Height Tube Pull Component DIAMETER²² LENGTH²² Diameter LengthHeat Nozzle TypeCondenser Total Weight Condenser Charge Refrigerant ChargeDry Operating²² Refrigerant Water Dry Operating²² RefrigerantAdditional Cooler Weights Additional Condenser WeightsAuxiliary Connection Sizes CondenserTotal 19EX Motor Weights 60 Hz Total 19EX Motor Weights 50 HzCompressor Weights Total 17EX Drive Component WeightsÐ 17EX Motors Ð Total Weight, Lbs English Ð 17EX Motors Ð Total Weight, Kg SINIH Waterbox Cover Weights Marine Waterbox Cover WeightsPsi KPa Dimensions Cooler Sizes 31-33Cooler Sizes Ft-in 31-33Machine Vibration Isolation Connect Piping NOZZLE-IN-HEAD Waterboxes Frame 3 and 5 Marine WaterboxesCooler Waterbox Pass Out ArrFrame 4 Marine Waterboxes Pumpout UnitWater Piping, Oil Cooler to Chilled Water Circuit Typical Relief Valve Locations and Data ValvesIndividual Component Ratings PH-HZGeneral Page General Oil Pump Wiring 19EX Shown8772 02525Insulation Requirements 11¤8 Foam Tubing 15¤819EX Chillers Front View Plan ViewInstallation START-UP Request Checklist Testing YES/NO Date to be Completed