Perlick H50IMW-AD, H50IMS-ADR, H50IMS-ADL, H50IMS-L, H50IMS-R manual Final Checklist

Page 22

G. Final Checklist

WARNING

CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are securely in place after installation. Make sure that none have fallen into the storage bin.

1)Is the icemaker level?

2)Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to 38°C) and the water temperature within 45°F to 95°F (7°C to 35°C) all year around?

3)Have the shipping carton, tape, and packing material been removed from the icemaker?

4)Have all electrical and water connections been made? Do electrical and water connections meet all national, state, and local code and regulation requirements?

5)Has the power supply voltage been checked or tested against the nameplate rating? Is the power supply a properly grounded, independent wall outlet?

6)Are the water supply line shut-off valve and drain valve installed? Has the water supply pressure been checked to ensure a minimum of 10 PSIG and a maximum of 113 PSIG?

7)Are all components, fasteners, and thumbscrews securely in place?

8)Has the end user been given this instruction manual, and instructed on how to operate the icemaker and the importance of the recommended periodic maintenance?

9)Has the end user been given the name and telephone number of an authorized service agent?

10)Has the product registration card been filled out and forwarded to the factory for warranty registration?

22

Image 22
Contents Perlick Contents Indicates important information about the use and care Important Safety InformationSerious injury UnitSpecifications A. Construction Perlick ICE Maker Nameplate RatingDimensions/Connections H50IMS-R, H-50IMS-LH50IMW H50IMS-ADL, H50IMS-ADR H50IMW-AD Location II. Installation and Operating InstructionsChecks Before Installation GeneralA Corner Built-In Installation SiteBetween a Cabinet and a Wall or Tall Cabinet Parts Overlay Panel Specification H50IMW Overlay Panel SpecificationH50IMW-AD Overlay Panel Specification Fabrication of Overlay Panel Screws Top Panel Notch Hinge B Filler BushingGasket Hinge Attachment of Overlay Panel to Door Bushing Gasket Setup Electrical ConnectionWater Supply and Drain Connections Final Checklist Startup Cleaning Solution III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning ProcedureTabs Sanitizing Solution Sanitizing ProcedureDischarge Tube Caps Spray Assembly Separator Slope Rail Storage Bin and Scoop MaintenanceStainless Steel Exterior CondenserPreparing the Icemaker for Long Storage 