3. Sanitizing Solution

IMPORTANT

For safety and maximum effectiveness, use the solution immediately after dilution.

Dilute 0.5 fl. oz. (14.8 ml or 1 tbs) of a 5.25% sodium hypochlorite solution (chlorine bleach) with 1 gallon (3.8 l) of warm water. This is a minimum amount. Make more solution if necessary. Using a chlorine test strip or other method, confirm that you have a concentration of about 200 ppm.

4.Sanitizing Procedure

1)Make sure the control switch is in the "OFF" position and the storage bin is empty.

2)Remove the slope from the storage bin by carefully bending it in the center and releasing it from the 2 slope shafts. See Fig. 28.

3)Remove each separator by lifting it to the horizontal position and pushing it hard inward. See Fig. 29.

Slope

Separator

Slope Shafts

Fig. 28

Fig. 29

4)Disconnect the suction tube. Allow the water tank to drain.

5)Spread out the tabs to unlock the water tank, then slide it out. See Fig. 30.

6)Lift off the ice chute from the front frame pipe and then from the rear frame pipe. See Fig. 31.

 

 

Rear Frame Pipe

 

 

 

Front Frame Pipe

Ice Chute

Tab

Tab

 

 

 

Water Tank

 

 

 

Fig. 30

 

 

Fig. 31

26

Image 26
Contents Perlick Contents Indicates important information about the use and care Important Safety InformationSerious injury UnitSpecifications A. Construction Perlick ICE Maker Nameplate RatingDimensions/Connections H50IMS-R, H-50IMS-LH50IMW H50IMS-ADL, H50IMS-ADR H50IMW-AD Location II. Installation and Operating InstructionsChecks Before Installation GeneralBetween a Cabinet and a Wall or Tall Cabinet Built-In Installation SiteA Corner Parts Overlay Panel Specification H50IMW Overlay Panel SpecificationH50IMW-AD Overlay Panel Specification Fabrication of Overlay Panel Screws Top Panel Notch Hinge B Filler BushingGasket Hinge Attachment of Overlay Panel to Door Bushing Gasket Setup Electrical ConnectionWater Supply and Drain Connections Final Checklist Startup Cleaning Solution III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning ProcedureTabs Sanitizing Solution Sanitizing ProcedureDischarge Tube Caps Spray Assembly Separator Slope Rail Storage Bin and Scoop MaintenanceStainless Steel Exterior CondenserPreparing the Icemaker for Long Storage 