Perlick H50IMS-L, H50IMS-ADR, H50IMS-ADL, H50IMW-AD, H50IMS-R Discharge Tube Caps Spray Assembly

Page 27

7)Disconnect the discharge tube from the spray assembly, then slide out the spray assembly. See Fig. 32.

8)Remove the two caps. See Fig. 33.

Discharge Tube

Caps

Spray Assembly

 

Fig. 32

Fig. 33

9)Soak all of the removed parts and the scoop in the sanitizing solution for 10 minutes. If the spray assembly nozzles are clogged, clean them with a wire or a suitable brush.

10)Rinse the parts thoroughly with clean water.

11)Refit the 2 caps in their correct positions. Make sure the reducing pipe is in place in the center. See Fig. 34.

12)Slide in the spray assembly along the rails on the left and right brackets. See Fig. 35. Connect the discharge tube securely to the spray assembly; a loose fitting may cause a water leak.

Reducing Pipe

Left Bracket

Right Bracket

 

Rail

Rail

 

Caps

 

Fig. 34

Discharge Tube

Fig. 35

 

13)Position and lock the ice chute onto the front and rear frame pipes by pushing the ice chute down until it clicks onto both frame pipes. See Fig. 36.

14)Slide in the water tank along the rails at the bottom of the left and right brackets until it locks into place. See Fig. 37.

 

Left Bracket

Right Bracket

Rear Frame

 

 

Pipe

 

 

Front Frame

 

 

Pipe

Rail

Rail

 

 

Ice Chute

Water Tank

 

 

 

Fig. 36

Fig. 37

27

Image 27
Contents Perlick Contents Unit Important Safety InformationSerious injury Indicates important information about the use and careSpecifications A. Construction Nameplate Rating Perlick ICE MakerH50IMS-R, H-50IMS-L Dimensions/ConnectionsH50IMW H50IMS-ADL, H50IMS-ADR H50IMW-AD General II. Installation and Operating InstructionsChecks Before Installation LocationBuilt-In Installation Site A CornerBetween a Cabinet and a Wall or Tall Cabinet Parts H50IMW Overlay Panel Specification Overlay Panel SpecificationH50IMW-AD Overlay Panel Specification Fabrication of Overlay Panel Screws Top Panel Notch Hinge B Filler BushingGasket Hinge Attachment of Overlay Panel to Door Bushing Gasket Electrical Connection SetupWater Supply and Drain Connections Final Checklist Startup Cleaning Procedure III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionTabs Sanitizing Procedure Sanitizing SolutionDischarge Tube Caps Spray Assembly Separator Slope Rail Condenser MaintenanceStainless Steel Exterior Storage Bin and ScoopPreparing the Icemaker for Long Storage 