Sub-Zero 424G, 424FSG manual Models 427G and 427RG Installation Overlay Door Panel

Page 27

Models 427G and 427RG Installation

27

Overlay Door Panel

The screw holes inside the door are hidden under a cover flap on the door gasket. It is necessary to lift the flap to insert the screws. Use as many screws as necessary to hold the door panel in place properly.

IMPORTANT NOTE: After the first three or four mounting screws are in place, but not completely tightened, close the door and check your panel fit. This is the time to make small adjustments. Once you are satisfied with the appear- ance, open the door and apply the remainder of the screws. Check all screws for tightness.

The metal frame on the glass door has numerous mounting holes on each side of the door. This is to accommodate the Sub-Zero accessory handles and provide for easy attachment of the handle through the door frame.

If you choose not to use the pre-drilled handle mounting holes, it will be necessary to fasten the handle from the rear of the door panel only, or drill one or more additional holes through the metal frame of the glass door.

The cross section illustration below shows how this hole passes through the door frame. The hole center is on the small locator groove in the front of the frame. A 1/4" (6) diameter hole is made in the front wall of the extrusion and a 13/32" (11) diameter hole through the rest of the frame.

GASKET

13/32" (11)

 

 

DIAMETER

 

GLASS

 

1/4" (6)

 

DIAMETER

subzero.com

IMPORTANT NOTE: Install screws in all the mounting holes in the door frame. The nature of the door panel with a narrow outer rim and no connecting center member requires the support provided by the glass door.

After the door panel installation is complete, apply the cover patches or plugs provided over the holes on the inside surface of the door.

The wine storage unit door is made with a sealed double wall tempered glass core. The drill must not contact this core when drilling. Be sure the hole is centered on the small groove in the front of the door frame and the drill passes squarely through the frame. If you are inexperienced with drilling, fasten the handle from the rear of the door panel only.

The cover patches or plugs are part of the insulation system on the door of the wine storage unit. Be sure to cover all the holes in the door that were used.

Door frame cross section.

Image 27
Contents Wine Storage Important Note ContentsSubzero.com Wine Storage Sub-Zero Wine StorageOverall Dimensions Models 424G and 424FSG InstallationTools and Materials Required Opening DimensionsElectrical Requirements Models 424G and 424FSG Installation Electrical RequirementsMoving the Unit Home Alarm SystemModel 424FSG Model 424GInstall Concrete Wedge Anchors Model 424FSG-WOOD FloorsModel 424FSG-CONCRETE Floors Models 424G and 424FSG Installation Position the Unit Home Alarm Connections Models 424G and 424FSG Installation Level the UnitDoor Panel Models 424G and 424FSG Installation Kickplate InstallationModels 424G and 424FSG Installation Overlay Door Panel Models 424G and 424FSG Installation Overlay Door Panel Complete the Installation Models 424G and 424FSG Installation Hinge AdjustmentModels 427G and 427RG Installation Tools and Materials Required Opening Dimensions Models 427G and 427RG Installation Electrical Requirements Anti-Tip Bracket Installation Concrete Floor Applications Wood Floor ApplicationsDual Installations Lock InstallationUnpack the Unit Models 427G and 427RG Installation Position the Unit Molding Installation Models 427G and 427RG Installation Level the Unit Models 427G and 427RG Installation Wiring Connections Door Panels Stainless steel panel Overlay panel Models 427G and 427RG Installation Overlay Door Panel Model 427RG Models 427G and 427RG Installation Drawer Panel InstallationOptional 90 Door Stop Models 427G and 427RG Installation Side PanelsInstallation Checklist AnchoringModel WS-30 Installation Model WS-30 Installation Site Preparation Framed, Overlay and Stainless Steel Models Detail a Flush Inset Installation Opening DimensionsOpening Widths 263/16 Dual Flush Inset Installation Opening DimensionsModel WS-30 Installation Electrical Requirements Anti-Tip Bracket Hardware Model WS-30 Installation Anti-Tip Bracket InstallationFloor Model WS-30 Installation Unpack the Unit Grille Height AdjustmentGrille Removal Model WS-30 Installation Position the Unit Door Height Adjustment Model WS-30 Installation Door AdjustmentOUT Adjustment Side to Side Tilt AdjustmentModel WS-30 Installation Panel Installation Install Kickplate Framed Panel Installation Model WS-30 Installation Framed PanelRaised Panel Framed Panel SpecificationsModel WS-30 Installation Overlay Panels Grille Panel Assembly Overlay Panel SpecificationsModel WS-30 Installation Flush Inset Panels Flush Inset Panel Specifications Model WS-30 Installation Flush Inset Panel Dual InstallationsDual Standard Installations Dual Flush Inset Installations Flush Inset Panels-Dual InstallationOpposite hinges Custom Side Panel Installation Model WS-30 Installation Side PanelsInstallation Checklist Service Information SUB-ZERO, INC. P. O. BOX 44848 MADISON, WI 53744 SUBZERO.COM
Related manuals
Manual 2 pages 3.57 Kb