
T40 Installation and Assembly
4. Attach the right side panel to the mounting floor in the same manner as the other two panels. Lock the side locking cams on the inside bottom and side of the panel. Insert
NOTE: Ensure all cam locks are in the open position before placing any panels.
NOTE: Do not break alignment block when placing panels in place.
5. Attach the front panel in the same manner as the others. Front panel will wrap around the sides. Lock all side and bottom cams when the panel
is in position. Insert T- handle wrench and twist clockwise until a positive stop is achieved.
6.Place the top panel on to the top of the cabinet with the refrigeration holes facing the first panel. Tread the refrigeration pipes through the supplied holes and ensure there is no binding.
NOTE: Ensure all cam locks are in the open position before placing any panels.
Lock all side cams when the panel is in position. Insert
1.Hole for Probes
2.Electrical Hole
3.Refrigerant Line Holes
•Attach the Left side deflector shield to the front panel with provided screws. The shield should cover the corner.
7.Place the control panel on the outside of the top and front of the unit. Attach with supplied screws and screw holes.