Venmar ESB10, QDE, ESC270 manual Operation, Rocker Switch Control

Page 10

11. OPERATION

Always turn on the hood before beginning cooking in order to establish an air flow in the kitchen. Let the blower run for a few minutes to clear the air after turning off the range.

ROCKER SWITCH CONTROL

HC0031

A

B

A.ON/OFF BLOWER AND SPEED CONTROL SWITCH:

This 3-position rocker switch controls the blower speed. Pressing on left side (1) will result in low speed operation, while pressing on right side (2) will turn on the blower to high speed. To stop the blower operation, set the rocker switch to the central position (0).

B.ON/OFF LIGHTING CONTROL SWITCH:

This 3-position rocker switch controls the lighting. Press either on left side (1) or right side (1) to obtain full lighting. To shut off the lights, set the rocker switch to the central position (0).

MECHANICAL PUSH-BUTTON CONTROL

HC0021

A

B

C

 

A.OFF BLOWER SWITCH:

Press on this switch to stop the blower operation.

B.SPEED BLOWER SWITCHES:

Press on left switch (1) to turn on the blower on low speed, on middle switch (2) to turn on the blower on medium speed, and on right switch (3) to turn on the blower on high speed.

CON/OFF LIGHTING SWITCH:

Press on this switch to turn on the fluorescent lights, and press again to turn them off.

- 10 -

Image 10
Contents Models ESB10, QDE, and ESC270 To Reduce the Risk of a Range TOP Grease Fire Table of Contents Tools Needed to Install the Range HoodAbout this Manual Install Ductwork Measure the InstallationPrepare the Installation Prepare the HoodInstall the ADAPTER/DAMPER Prepare the Hood CONT’D Install the Hood Install the ADAPTER/DAMPER CONT’D Connect Wiring Reinstall Bottom Panel and Filters Fluorescent LampsCleaning Don’tRocker Switch Control OperationModel ESB10 Service PartsModel ESC270 Model QDE SV06727 SV04281Modèles ESB10, QDE ET ESC270 Avertissement Propos DE CE Guide Outils Nécessaires À L’INSTALLATION DE LA HotteTable DES Matières Installation DES Conduits Mesures DE L’INSTALLATIONPréparation DE L’INSTALLATION Préparation DE LA HotteInstallation DE L’ADAPTATEUR/VOLET Préparation DE LA Hotte SuiteInstallation DE LA Hotte Installation DE L’ADAPTATEUR/VOLET SuiteBranchement Réinstallation DU Panneau Inférieur Lampes FluorescentesEntretien FaireCommande À Interrupteurs À Bascule FonctionnementModèle ESB10 12. Pièces DE RemplacementModèle ESC270 Modèle QDE Modelos ESB10, Qdey ESC270 Advertencia Herramients Necesarias Para Instalar LA Campana Àcerca DE Este ManualÍndice Dimensiones DE LA Instalación Instalación DE LOS TubosPreparación DE LA Instalación Preparación DE LA CampanaPreparación DE LA Campana Continuación Instalación DEL ADAPTADOR/DISPOSITIVO DE CierreInstalación DE LA Campana Conexión DEL CableadoReinstalación DEL Tablero Inferior Lámparas FluorescentesLimpieza Debe hacerse No debe hacerseFuncionamento Interruptores OscilantesModelo ESB10 PiezasModelo ESC270 Modelo QDE